Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • YouTube
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • Shuttler Lakshya Sen Finishes Third At King Cup International
    Shuttler Lakshya Sen Finishes Third At King Cup International Sports
  • Access Denied Sports
  • Tyre makers facing severe crunch in domestic natural rubber availability: ATMA
    Tyre makers facing severe crunch in domestic natural rubber availability: ATMA Business
  • Access Denied Business
  • “Vrushali Has A Great Backhand Counter,”: Bengaluru Jawans’ Star Player Jack Foster
    “Vrushali Has A Great Backhand Counter,”: Bengaluru Jawans’ Star Player Jack Foster Sports
  • ICC lawyer warns over preventing aid getting to Gaza
    ICC lawyer warns over preventing aid getting to Gaza World
  • Stock markets decline for 3rd straight session on FII outflows, H-1B concerns
    Stock markets decline for 3rd straight session on FII outflows, H-1B concerns Business
  • Finland to hold road shows on circular economy in India next year
    Finland to hold road shows on circular economy in India next year Business
On improving wind energy generation | Explained

On improving wind energy generation | Explained

Posted on November 11, 2024 By admin


Wind turbines along the Kadayanallur-Tenkasi state highway road in Tamil Nadu.
| Photo Credit: Jothi Ramalingam. B

The story so far: Tamil Nadu, which is a pioneer in wind mill installations, has wind turbines that are over 30 years old. The Tamil Nadu government released the “Tamil Nadu Repowering, Refurbishment and Life Extension Policy for Wind Power Projects – 2024” in August this year. However, wind energy generators have opposed the policy, approached the Madras High Court and got a stay. They have demanded a policy that will “promote wind energy generation”.

Also read: Wind energy generation in Tamil Nadu expected to drop slightly

What is the wind energy capacity and potential in India?

The National Institute of Wind Energy (NIWE) says that India has wind power potential for 1,163.86 GW at 150 metres above ground level, and is ranked fourth in the world for installed wind energy capacity.

At 120 metres above ground level, which is the normal height of wind turbines now, the potential is 695.51 GW, including the 68.75 GW from Tamil Nadu. Only about 6.5% of this wind potential is used at the national level and nearly 15% in Tamil Nadu. Gujarat, Tamil Nadu, Karnataka, Maharashtra, Rajasthan, and Andhra Pradesh are the leading States for installed wind energy capacity, collectively contributing 93.37% of the country’s wind power capacity installation. Tamil Nadu has seen the installation of wind turbines since the 1980s, and today it has the second largest installed wind energy capacity with 10,603.5 MW, according to data available with the Ministry of New and Renewable Energy (MNRE). Of the 20,000 wind turbines in the State, nearly 10,000 are of small capacities, that is less than one MW.

How are wind turbines maintained?

Wind turbines that are more than 15 years old or have less than 2 MW capacity, can be completely replaced with new turbines, which is known as repowering. They can also be refurbished by increasing the height of the turbine, changing the blades, installing a higher capacity gear box, etc., to improve the energy generated. These can be done for standalone wind mills, or a group of wind mills owned by multiple generators. When wind energy generators take up safety measures in the old turbines and extend its life, its called life extension.

The MNRE first came out with a “Policy for Repowering of the Wind Power Projects” in 2016 and based on consultations with stakeholders, released the “National Repowering & Life Extension Policy for Wind Power Projects -2023”. The NIWE estimates the repowering potential to be 25.4 GW if wind turbines of less than 2 MW capacity are taken into consideration.

What does repowering and refurbishing entail?

Wind energy generators say that when turbines were installed in the 1980s, potential wind sites were mapped and the mandatory gap required between two wind mills were determined based on the technology available then. All the turbines were in the sub one MW category. Over the years, the wind mill manufacturing sector has matured and technology has evolved. Habitations have come up between wind sites, posing new challenges, and wind energy evacuation and transmission infrastructure close to the wind sites needs to be strengthened to match the generation.

Sources in the wind energy industry point out that a 2 MW wind turbine is usually 120 metres high and requires 3.5 acres of land. It can generate upto 65 lakh units of power. A 2.5 MW turbine, which is available in the market now, is 140 metres high and can generate 80 lakh units. It requires five acres. So, when an existing wind turbine is to be repowered by replacing it with a high capacity turbine, more land is required.

Further, at Aralvaimozhi in Tamil Nadu, a high potential wind site, the 48 MW installed capacity now is made up of mostly 250 KW turbines and the potential at the site is for 100 MW. A project to have three sub-stations of 230 KVA each at ₹800 crore was sanctioned six years ago and is yet to take off for multiple reasons. In Tamil Nadu, wind mills installed after 2018 do not have banking facility. When a turbine is repowered, it will be treated as a new installation and the generator cannot bank the energy generated. This impacts the financial viability of the project, say the sources.

What is the way forward?

Among the wind energy generating States, the repowering potential is the highest in Tamil Nadu with over 7,000 MW of installed capacity that can be replaced or refurbished. If the small turbines are repowered or refurbished, the contribution of wind energy to total energy consumed during the peak windy seasons can go up easily by 25%, says wind energy consultant A.D. Thirumoorthy.

While there have been generators which have replaced turbines in the past without government support, the policy itself does not promote wind energy generation, claim the generators. It should look at challenges on the field and consider how the wind energy potential can be harnessed fully by the generators. “No industry or energy generator will want to invest in a project that is not financially viable. The repowering policy is not commercially beneficial,” said a textile mill owner in Coimbatore who has invested in wind energy.

Published – November 11, 2024 08:30 am IST



Source link

Business Tags:tamil nadu renewable energy, tamil nadu wind energy, tamil nadu wind energy policy, tamil nadu wind power, wind energy in tamil nadu

Post navigation

Previous Post: How do lightning rods prevent lightning strikes from reaching people?
Next Post: COP16: Will financial roadblocks continue to hinder conservation efforts? | Explained

Related Posts

  • Rupee rises 7 paise to 84.22 against U.S. dollar in early trade
    Rupee rises 7 paise to 84.22 against U.S. dollar in early trade Business
  • Hindenburg report allegations: Adani group stocks tumble
    Hindenburg report allegations: Adani group stocks tumble Business
  • Access Denied Business
  • Seven Adani group firms say received SEBI show cause notices
    Seven Adani group firms say received SEBI show cause notices Business
  • Stock markets bounce back after three-day decline; Sensex jumps 639 points
    Stock markets bounce back after three-day decline; Sensex jumps 639 points Business
  • Repco Bank sets credit growth target of ₹21,750 cr. for FY25
    Repco Bank sets credit growth target of ₹21,750 cr. for FY25 Business

More Related Articles

Access Denied Business
Net direct tax collection grows 8% to ₹17.04 lakh crore on slower refunds Net direct tax collection grows 8% to ₹17.04 lakh crore on slower refunds Business
Fiscal deficit at 29.9% of full-year target at July-end: CGA data Fiscal deficit at 29.9% of full-year target at July-end: CGA data Business
Watch: Budget 2024 | What is in store for West Bengal? Watch: Budget 2024 | What is in store for West Bengal? Business
Spectrum auction to start from May 20 Spectrum auction to start from May 20 Business
Access Denied Business
SiteLock

Archives

  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Gold ETF prices revive as investors flock on higher import duties on yellow metal
  • Assam ships first legal agarwood chips to West Asia
  • How the anti-defection law is going to operate in the AIADMK case?
  • ATS questions 57 in Maharashtra over alleged gangster network links
  • Nicobarese oppose proposal for three wildlife sanctuaries

Recent Comments

  1. Stevemonge on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. RichardClage on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. StevenLek on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. Leonardren on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. NathanQuins on UP Teacher Who Asked Students To Slap Muslim Classmate
  • Access Denied Sports
  • How is the immune system kept in check? | Explained
    How is the immune system kept in check? | Explained Science
  • Lawyer, Cops Save Driver From Angry Mob
    Lawyer, Cops Save Driver From Angry Mob Nation
  • How Did Saif Ali Khan’s Attacker Enter Building? What Cops Suspect
    How Did Saif Ali Khan’s Attacker Enter Building? What Cops Suspect Nation
  • Access Denied
    Access Denied Nation
  • 3rd Assassination Attempt? Iran Man Charged With Plotting To Kill Trump
    3rd Assassination Attempt? Iran Man Charged With Plotting To Kill Trump World
  • Why do cyclones move towards land? | Explained
    Why do cyclones move towards land? | Explained Science
  • Govt grants one-year extension to RBI Deputy Governor Rajeshwar Rao
    Govt grants one-year extension to RBI Deputy Governor Rajeshwar Rao Business

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.