Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • NDA 3.0 must use political capital to implement structural reforms in upcoming Budget: D. Subbarao
    NDA 3.0 must use political capital to implement structural reforms in upcoming Budget: D. Subbarao Business
  • WhatsApp down for thousands, Downdetector shows
    WhatsApp down for thousands, Downdetector shows World
  • On India vs Pakistan World Cup Clash, Ramiz Raja’s Bold ‘Outside Chance’ Declaration
    On India vs Pakistan World Cup Clash, Ramiz Raja’s Bold ‘Outside Chance’ Declaration Sports
  • Access Denied Sports
  • Trump Invites Netanyahu To White House On February 4: Israeli PM Office
    Trump Invites Netanyahu To White House On February 4: Israeli PM Office World
  • Vladimir Putin Says Donald Trump Should Be “Cautious”, “He’s Not Safe Now”
    Vladimir Putin Says Donald Trump Should Be “Cautious”, “He’s Not Safe Now” World
  • US, Others Looking At “Variety Of” Options For Future Of Gaza After Hamas
    US, Others Looking At “Variety Of” Options For Future Of Gaza After Hamas World
  • PSG signs Napoli’s star winger Khvicha Kvaratskhelia until 2029
    PSG signs Napoli’s star winger Khvicha Kvaratskhelia until 2029 Sports
What do two PSLV mission failures in a row mean for ISRO? | Analysis

What do two PSLV mission failures in a row mean for ISRO? | Analysis

Posted on January 12, 2026 By admin


On May 18, 2025, the PSLV-C61 mission was a rare launch failure for the Indian Space Research Organisation (ISRO). The rocket has a reputation as a ‘workhorse’ because ISRO had had a string of successes with it and each of those launches had been thoroughly as intended. Today, however, ISRO faces two PSLV mission failures in a row following the apparent non-fullfilment of the PSLV-C62 mission as well.

On January 12, roughly 50 minutes after the 10.17 am liftoff of the PSLV-C62 mission from Sriharikota, ISRO chairman V. Narayanan confirmed that the rocket’s third stage had suffered an anomaly. He added that ISRO would analyse the stage’s performance further and return with more details.

PS3 solid motor

The PSLV rocket has four stages. The C61 mission saw the rocket in its XL configuration, with six boosters strapped on to its first stage. Its primary payload was the EOS-09 (a.k.a. RISAT-1B) satellite, a heavy radar-imaging satellite designed to observe the earth’s surface in all weather conditions, and was to be used for disaster response and strategic surveillance. The rocket was to place it in a sun-synchronous polar orbit at an altitude of around 529 km.

The lift-off was normal. The first and second stages performed nominally, separating as planned and the rocket was on the correct trajectory in these phases. The anomaly occurred when the third stage, PS3 — a motor using solid fuel — was operating.Around 203 seconds into the flight, telemetry data indicated a sharp and unexpected drop in the motor’s chamber pressure within the third stage motor.The drop resulted in the engine not generating the requisite thrust, causing the rocket to not be able to reach its intended orbit. ISRO subsequently aborted the mission and the rocket, along with the EOS-09 satellite, fell back.


Editorial | Tough timing: on ISRO PSLV-C61 mission, India’s space programme

After the incident, a Failure Analysis Committee (FAC) got to work and (presumably) pinpointed the issue to be the PS3 solid motor system. The particular defect seemed to be a structural or material failure within the third stage’s nozzle or casing system, leading to the loss of pressure. The suspect mechanism? A potential issue with the flex nozzle control system or the insulation lining, which failed to contain pressurised gases, effectively choking the engine’s power.

ISRO also responded by grounding all PSLV launches for around eight months while it implemented strict quality control measures and reinforced the design of the third stage.

Failure Analysis Committee report

Note in the previous passage the use of the words “potential”, “presumably”, “seemed to be”, “suspected”, etc. — they’re not accidental. This is because ISRO falls under the Department of Space, which comes under the Prime Minister’s Office (PMO). The FAC submitted its report to the PMO, but which hasn’t cleared the report for public release. 

The reasons are not clear. If the issue is sensitive information related to any of the payloads, it’s also possible to release a full technical failure report while redacting any sensitive information. After all it was clear that the problem was localised to the PS3 stage, and did not involve the PS4 stage or any of the payloads installed on the rocket.

Another possible reason is commerce. ISRO is aggressively pushing the PSLV as a commercial product through NewSpace India, Ltd (NSIL). The PS3 is a solid fuel motor and a technologically mature component; it shouldn’t fail. So a failure here suggests a lapse in quality assurance or supply chain management rather than a design flaw per se.

If the root cause was simple negligence, such as a manufacturing defect — which media reports of the FAC’s conclusions indicated —  or a missed inspection, admitting this in public could be devastating for the PSLV’s commercial insurance premiums and reputation. It is plausible, although to what degree of certainty is unclear, that the report is also being withheld to prevent claims of gross negligence from commercial partners or to avoid ‘spooking’ the market right before the PSLV-C62 launch.

Next, technically speaking, saying the mission failed due to a “drop in chamber pressure” is almost a tautology: it’s describing the symptom, not the cause. This is like saying a person with a severe disease died of heart failure or brain death. Ultimately a person in India can die only of these causes, yet it’s also not useful to know for a person studying the disease and trying to understand how it inflicted its harm.

A sudden pressure drop in a solid motor usually implies a casing breach or a nozzle blowout. If the nozzle blew out, such an incident would raise important questions about the integrity of the materials used in the entire fleet. By keeping the report classified, ISRO avoids having to publicly answer whether this was a bad batch of materials, which would ground the fleet for longer, or a fundamental design fatigue in the “workhorse” rocket alone.

Taken together, there are many reasons to believe the FAC report isn’t simply stuck with the PMO. It remains plausible that it’s being contained because the truth involves either sensitive military data or an embarrassing lapse in quality control that would harm India’s nascent efforts to privatise space and spaceflight endeavours.

Effects of unintended roll

This is the context against which the PSLV-C62 mission failure operates. ISRO Chairman V. Narayanan said following the PSLV-C62 launch that PS3 had suffered a “roll rate disturbance, leading to a deviation in its flight path”.

The roll refers to the rotation of the rocket around its longitudinal axis, which is the imaginary line running from the nose cone to the tail.

For a rocket to reach orbit, it must maintain a very precise orientation. While some rotation, called spin stabilisation, is sometimes intentional, an unintended roll, or disturbance, can be fatal for two reasons. First, the rocket’s ‘brain’, the inertial navigation system, uses gyroscopes to know which way is ‘up’. If the rocket acquires a high roll rate, meaning if it starts spinning violently, the sensors can become saturated or dizzy, leaving the system to lose track of which way it’s pointing. Eventually it can no longer steer the rocket towards the correct orbit.

Second, while the PS3 motor generally provides thrust, it doesn’t have its own roll control thrusters. Instead it uses the small thrusters of the stage sitting on top of it, i.e. the PS4 stage, to keep it steady. The disturbance reported during the PSLV-C62 mission implies something on the PS3 motor, for example a gas leak from the side of the nozzle, generated a large twisting force. This torque could have been stronger than what the small PS4 thrusters could counteract, leaving the rocket to corkscrew out of control.

To be sure, this is a preliminary analysis. Think of it as an educated guess. Only a full-fledged failure analysis by technical teams at ISRO can reveal what actually went wrong.

Big picture

That being said, given the apparent mode of failure of the PSLV-C62 mission, it’s hard to believe the two consecutive failures are unrelated. PSLV-C61 suffered a “drop in pressure”, suggesting that the nozzle throat could have eroded too fast or the casing was breached, venting gas sideways. Assuming this was the issue in PSLV-C61 and assuming the same breach happened slightly differently in PSLV-C62 — say, a jet of gas leaked out the side of the nozzle joint — it would have created a large pinwheel effect, leaving the rocket spinning out of control.

However, irrespective of the precise causes of failure, the fact that it happened at all is an indictment of the decision to keep the PSLV-C61 FAC report internal. Because by doing that, ISRO also avoided external checks of its ‘return to flight’ criteria, which will be under greater scrutiny now, including to consider whether ISRO implemented a superficial fix.

Put another way, whatever is still up in the air, the big picture right now is certainly that ISRO launched the PSLV-C62 mission eight months after a major failure while concealing the investigation’s results.



Source link

Science Tags:failed missions of isro, isro misison failure, pslv mission failed, pslv mission failure, pslv success rate

Post navigation

Previous Post: What does two PSLV mission failures in a row mean for ISRO? | Analysis
Next Post: Access Denied

Related Posts

  • Nobel Prize in Physiology or Medicine 2024: What is the research that won the prize? | Explained  Science
  • Hong Kong blaze: Why buildings have disastrous fires and how they can be prevented
    Hong Kong blaze: Why buildings have disastrous fires and how they can be prevented Science
  • Tropical forests may be getting too hot for photosynthesis
    Tropical forests may be getting too hot for photosynthesis Science
  • Things to know about the Nobel Prizes
    Things to know about the Nobel Prizes Science
  • COP-30 to focus on known solutions, says its President
    COP-30 to focus on known solutions, says its President Science
  • Disputed review claims link between fluoride levels, childhood IQ loss
    Disputed review claims link between fluoride levels, childhood IQ loss Science

More Related Articles

How did the Baltimore bridge disaster happen? | Explained How did the Baltimore bridge disaster happen? | Explained Science
Sci-Five | The Hindu Science Quiz: On Snow Leopards Sci-Five | The Hindu Science Quiz: On Snow Leopards Science
CE20 cryogenic engine clears human rating test, ready for Gaganyaan missions CE20 cryogenic engine clears human rating test, ready for Gaganyaan missions Science
Where does ‘us versus them’ bias in the brain come from? Where does ‘us versus them’ bias in the brain come from? Science
What the ‘moral distress’ of doctors tells us about eroding trust in health care What the ‘moral distress’ of doctors tells us about eroding trust in health care Science
ISRO wants to transfer 50% of PSLV development to industry consortium, says V. Narayanan ISRO wants to transfer 50% of PSLV development to industry consortium, says V. Narayanan Science
SiteLock

Archives

  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Access Denied
  • U.S. F.A.A. warns of ‘military activities’ over Mexico, Central America
  • Access Denied
  • Emergency calls reveal chaos after Minneapolis ICE shooting as city braces for more unrest
  • Access Denied

Recent Comments

  1. DanielWaype on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. TimothyDet on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. Robertbar on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. WilliamUnsut on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. Walterhek on UP Teacher Who Asked Students To Slap Muslim Classmate
  • Canopy Outside Rajkot Airport Terminal Collapses Amid Heavy Rain
    Canopy Outside Rajkot Airport Terminal Collapses Amid Heavy Rain Nation
  • Former England batter Graham Thorpe passes away
    Former England batter Graham Thorpe passes away Sports
  • Man Loses Rs 50,000 After Message From Person Posing As Senior Official
    Man Loses Rs 50,000 After Message From Person Posing As Senior Official Nation
  • Row Over Tamil Nadu Governor’s “Secularism” Remark
    Row Over Tamil Nadu Governor’s “Secularism” Remark Nation
  • Financial Loss And More: What BCCI Contract Snub Means For Ishan Kishan And Shreyas Iyer
    Financial Loss And More: What BCCI Contract Snub Means For Ishan Kishan And Shreyas Iyer Sports
  • PM Modi On What India Aims To Achieve With Grand Show At G20 Summit
    PM Modi On What India Aims To Achieve With Grand Show At G20 Summit Nation
  • Mahsa Amini, the Kurdish-Iranian woman who died in police custody, is awarded EU human rights prize
    Mahsa Amini, the Kurdish-Iranian woman who died in police custody, is awarded EU human rights prize World
  • UK Burglar Involved In Theft Worth Over A Million Dollars Caught By Apple AirTag
    UK Burglar Involved In Theft Worth Over A Million Dollars Caught By Apple AirTag World

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.