Railway Minister – Artifex.News https://artifex.news Stay Connected. Stay Informed. Sun, 30 Jun 2024 09:44:03 +0000 en-US hourly 1 https://wordpress.org/?v=6.6 https://artifex.news/wp-content/uploads/2023/08/cropped-Artifex-Round-32x32.png Railway Minister – Artifex.News https://artifex.news 32 32 Railway Minister Ashwini Vaishnaw: Railways to invest ₹1 lakh crore in Odisha in next five years https://artifex.news/article68351593-ece/ Sun, 30 Jun 2024 09:44:03 +0000 https://artifex.news/article68351593-ece/ Read More “Railway Minister Ashwini Vaishnaw: Railways to invest ₹1 lakh crore in Odisha in next five years” »

]]>

Union Minister Ashwini Vaishnaw. File
| Photo Credit: ANI

Railway Minister Ashwini Vaishnaw on June 30 said new railway projects worth ₹1 lakh crore will be implemented in Odisha in the next five years.

Mr. Vaishnaw said this while addressing a felicitation programme organised by Odisha BJP in Bhubaneswar to felicitate the party’s 20 MPs and 78 MLAs elected in recently held Lok Sabha elections and Assembly elections in Odisha.

“The Congress government and the then Biju Janata Dal (BJD) government have neglected the development of the railway sector in Odisha. So, with the formation of a double-engine government of the BJP in Odisha and Centre, now, the gap created during the past years, will be met by creating a new record in these five years,” he said.

“Though many mega railway projects have been sanctioned, those were delayed due to delay in land acquisition by the previous BJD government,” said Mr. Vaishnaw, adding, “Now double engine government is formed and the pace of the railway projects will be accelerated.”

The Union Minister said the allocation to Odisha in the Railway Budget has been enhanced from ₹800 crore during the UPA government tenure to more than ₹10,000 crore during Modi government.

“During the past three consecutive years, more than ₹10,000 crore has been allocated to the State in the railway sector,” he said.

Mr. Vaishnaw further said a new railway line of 1,826 km was constructed in Odisha during the last 10 years, which is higher than the total railway network of Sri Lanka (1,700 km). He also said that 315 special trains will run to and from Puri during the Rath Yatra of Lord Jagannath for smooth travel and convenience of the pilgrims. “Last year, 222 trains were run during the Rath Yatra. The special trains have been planned from 25 districts of Odisha,” he added.

Mr. Vaishnaw, who is also the IT Minister, said that an electronic manufacturing cluster and a semi-conductor training centre will be set up in Odisha.

Congratulating the newly elected MLAs and MPs, he expressed confidence that the BJP government will continue to serve the people of Odisha for the next 50 years. Union Education Minister Dharmendra Pradhan said Odisha Chief Minister Mohan Charan Majhi and two Deputy Chief Ministers K. V. Singh Deo and Pravati Parida are like Lord Jagannath and his siblings Lord Balabhadra and Devi Subhadra who have been given a big responsibility for the development of the State.

A lot of first-time MLAs and MPs have been elected in this election and the State for the first time has CM and Deputy CMs belonging to the BJP. With this team, a new Odisha will be built which will help in building a ‘Viksit Bharat’, Mr. Pradhan said.

Union Tribal Affairs Minister Jual Oram advised the BJP MLAs and MPs to have a mindset of ‘nation first, party second and self last’.

Mr. Oram said the BJP has helped the BJD to form a government in the State to end the Congress government. “But, they became “arrogant and became worse” like the Congress government. So, people have elected the BJP government,” he said.



Source link

]]>
1st Trial Train Crosses World’s Tallest Railway Bridge, Chenab: Union Railway Minister https://artifex.news/1st-trial-train-crosses-worlds-tallest-railway-bridge-chenab-union-railway-minister-5904735rand29/ Sun, 16 Jun 2024 18:32:56 +0000 https://artifex.news/1st-trial-train-crosses-worlds-tallest-railway-bridge-chenab-union-railway-minister-5904735rand29/ Read More “1st Trial Train Crosses World’s Tallest Railway Bridge, Chenab: Union Railway Minister” »

]]>

“All construction works for the USBRL are nearly finished”: Ashwini Vaishnaw (File)

New Delhi:

Union Railway Minister Ashwini Vaishnaw announced on Sunday that the first trial run of the Sangaldan-Reasi train was completed, a significant milestone of crossing the world’s tallest railway bridge, Chenab.

Vaishnaw said, “1st trial train has successfully run from Sangaldan to Reasi, including crossing the Chenab Bridge.”

He also said, “All construction works for the USBRL are nearly finished, with tunnel No.1 remaining partially incomplete.”

Notably, the Chenab Bridge in Jammu and Kashmir is taller than the Eiffel Tower in Paris.

As the Udhampur Srinagar Baramulla Rail Link (USBRL) Project is almost completed, Indian Railways is edging closer to connecting the Kashmir Valley to the rest of the railway network.

Chenab Bridge is a structural marvel built across a gorge of Chenab Bridge in the Reasi district of Jammu and Kashmir under the USBRL Project.

This bridge was constructed 359 metres (around 109 feet) above the Chenab River in the Jammu and Kashmir region, and is around 35 metres taller than the Eiffel Tower.

Earlier, the Ministry of Railways made it to the “Limca Book of Records” for “most people at a public-service event – multiple venues.

“The Railways Ministry organised an event on February 26, 2024, which was attended by 40,19,516 people at 2,140 venues.

The event was organised for the inauguration of road over/road under railway bridges and for laying the foundation stones of railway stations by Prime Minister Narendra Modi.

The mammoth effort and mobilisation of Indian Railways have been recognised, and the same has entered the prestigious Limca Book of World Records.

Meanwhile, Ashwini Vaishnaw assumed charge as Minister of Railways for the second time under the leadership of Prime Minister Narendra Modi on Tuesday morning in Delhi.

Vaishnaw has been assigned portfolios as Minister of Information and Broadcasting, and Minister of Electronics and Information Technology, apart from the Railways Ministry.

Earlier on Friday, Union Railways Minister Ashwini Vaishnaw on Friday said that India’s first Vande Bharat sleeper trains will be on track within two months.

Vaishnaw said, “The completion work of the trainset of the Vande Bharat sleeper train is in full swing and the first train will be on track within two months. All technical works are in the last phase. The trainset is manufactured by BEML Ltd at its rail unit in Bangalore. The much-awaited Vande Bharat Sleeper version will provide easy mobility to commuters and offer various comforts in the near future with global standards.”

The Minister said that the Vande Bharat sleeper train body is made of high-grade austenitic stainless steel and includes crash-worthy elements integrated into the crash buffers and couplers.

“The car body structure is crafted with high-grade Austenitic stainless steel, featuring crashworthy elements integrated into the crash buffers and couplers. Complying with stringent safety standards, all materials and aggregates in the trainset adhere to the Fire standard requirements as per EN45545 HL3 grade,” Vaishnaw said.

Vaishnaw further added that the Vande Bharat Sleeper Trains designed by BEML prioritize both aesthetic appeal and functionality in their design.

“The Vande Bharat Sleeper Trains designed by BEML prioritize both aesthetic appeal and functionality in their interiors, sleeper berths, and exteriors. From the front nose cone to interior panels, seats and berths, interior lights, couplers, gangways and beyond, every element is meticulously designed to meet the exacting standards of the sleeper trainset,” he said.

Notably, India’s first semi-high speeds indigenously built Vande Bharat trains have completely transformed the passenger experience. After the success of this modern train, Indian Railways is now set to launch its indigenous high-speed trains, Vande Sleeper.

Designed for travel at speeds of up to 200 km/h, the Vande Bharat sleeper train is envisioned to provide an alternative to the present Rajdhani Express for premium long-distance travel.

(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)



Source link

]]>
“In Next 5 Years, PM Modi Guarantees That…”: Railway Minister Ashwini Vaishnaw https://artifex.news/in-next-5-years-pm-modi-guarantees-that-railway-minister-ashwini-vaishnaw-5505158rand29/ Tue, 23 Apr 2024 10:46:20 +0000 https://artifex.news/in-next-5-years-pm-modi-guarantees-that-railway-minister-ashwini-vaishnaw-5505158rand29/ Read More ““In Next 5 Years, PM Modi Guarantees That…”: Railway Minister Ashwini Vaishnaw” »

]]>

Railways will be further strengthened, Ashwini Vaishnaw said. (File)

New Delhi:

Union Railways and IT Minister Ashwini Vaishnaw said on Tuesday that in the next five years, Prime Minister Narendra Modi guarantees that almost any passenger who wants to travel can easily get a confirmed ticket.

In an interaction with IANS, Ashwini Vaishnaw said that in the last 10 years, PM Modi has done unprecedented transformation in Railways.

“In the next five years, PM Modi guarantees that the capacity of the Railways will be increased so much that almost any passenger who wants to travel can easily get a confirmed ticket,” the Union Minister emphasised.

Sharing an example of how the Indian Railways has transformed in the last decade, the Union Minister informed that in the process of building railway tracks, only 17,000 kilometres of tracks were built between 2004 and 2014.

“From 2014 to 2024, 31,000 kilometres of new tracks were built. In the 10 years from 2004 to 2014, only around 5,000 kilometres were electrified, whereas in the last 10 years, a staggering 44,000 kilometres of railway electrification took place,” Ashwini Vaishnaw noted.

“Only 32,000 coaches were made from 2004-2014. In the last 10 years, 54,000 coaches were built. For the dedicated freight corridor, not even a single kilometre was commissioned before 2014. Now, two dedicated freight corridors of 2,734 kilometres have been commissioned,” the Union Minister informed.

In the next five years, Railways, which are a strong link in the growth of the country’s economy, “will be further strengthened and the facilities, especially for the passengers, will be expanded at a much faster pace”.

(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)



Source link

]]>
Railway Minister Shares Video Of Ballastless Track For Bullet Train: ”First Time In India” https://artifex.news/railway-minister-shares-video-of-ballastless-track-for-bullet-train-first-time-in-india-5331772rand29/ Fri, 29 Mar 2024 04:00:52 +0000 https://artifex.news/railway-minister-shares-video-of-ballastless-track-for-bullet-train-first-time-in-india-5331772rand29/ Read More “Railway Minister Shares Video Of Ballastless Track For Bullet Train: ”First Time In India”” »

]]>

According to Mr Vaishnaw, 295.5 km of piers and 153 km of viaducts have already been finished.

Railway Minister Ashwini Vaishnaw took to X on Thursday to share a video of India’s first ballastless track system being developed for the bullet train project between Mumbai and Ahmedabad. Significant progress has been achieved for the Bullet Train, which has a 320 kmph speed barrier, the minister revealed. According to Mr Vaishnaw, 295.5 km of piers and 153 km of viaducts have already been finished.

He posted a video of the same on his X account and wrote, “Bharat’s first ballastless track for Bullet Train. 320 kmph speed threshold, 153 km of viaduct completed, 295.5 km of pier work completed. More to come in Modi 3.0”. 

Watch the video here:

Ballastless track, or ‘slab track’ is growing in popularity in some countries for high-speed lines. Notably, this is for the first time, the J-slab ballastless track system is being used in India. The innovative track system features pre-cast track slabs meticulously equipped with fastening devices and rails.

This slab rests on the RC track bed which has a thickness of approximately 300mm and is constructed in situ (at the site) for individual UP and Down track lines on the viaduct top.  The RC track bed boasts a width of 2420mm, ensuring stability, National High-Speed Rail Corporation Ltd (NHSRCL) said.

“The bullet train project has to be seen from the perspective of integrating economies. In the first corridor that Indian railways are doing, Mumbai, Thane, Vapi, Baroda, Surat, Anand and Ahmedabad – all these economies will become one single economy. So you can have breakfast in Surat, go and complete your work in Mumbai, and come back with your family in the night,” Mr Vaishnaw said at NDTV Indian of the Year award on March 24. 

The projected cost is an estimated ₹ 1.08 lakh crore, of which the Centre is committed to providing ₹ 10,000 crore, while Gujarat and Maharashtra will contribute ₹ 5,000 crore each. The remaining funding will be secured through a loan from Japan – at a minimal 0.1 per cent interest rate.





Source link

]]>