Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • YouTube
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • Trump welcomes Zelenskyy for talks, asserts Russia and Ukraine both want peace, however elusive
    Trump welcomes Zelenskyy for talks, asserts Russia and Ukraine both want peace, however elusive World
  • IMF cuts growth outlook, warns world already drifting toward more adverse scenario
    IMF cuts growth outlook, warns world already drifting toward more adverse scenario World
  • Access Denied
    Access Denied Nation
  • Moment of my life: RCB ace Shreyanka describes meeting idol Virat Kohli
    Moment of my life: RCB ace Shreyanka describes meeting idol Virat Kohli Sports
  • PCB’s 1st Reaction On Champions Trophy 2025 Schedule: “Agreement Based On…”
    PCB’s 1st Reaction On Champions Trophy 2025 Schedule: “Agreement Based On…” Sports
  • Rupee rises 4 paise to settle at 84 against US dollar
    Rupee rises 4 paise to settle at 84 against US dollar Business
  • Access Denied
    Access Denied Nation
  • Congo and Rwanda say peace talks in Angola will not take place
    Congo and Rwanda say peace talks in Angola will not take place World
India’s 1st Dedicated Railway Test Track Is Being Constructed In Rajasthan

India’s 1st Dedicated Railway Test Track Is Being Constructed In Rajasthan

Posted on November 9, 2024 By admin


The construction of test track includes seven big and 129 small bridges (Representational)

Nawa, Rajasthan:

A dedicated railway test track is being constructed in Rajasthan to develop the facility for testing rolling stock. This track will be completed by December 2025. The country’s first train trial track in Rajasthan is almost ready. This 60 km long track is not completely straight but many curved points have been made. With this, a trial can be taken of how the train coming at speed will pass on the curved track without reducing the speed. In these curves, some curves are made for lower speed and some are made for high speed. After the completion of the first phase, bullet trains can also be tested at a speed of 230 kmph. The establishment of the country’s first dedicated test track will establish new dimensions in the testing of high-speed rolling stock items in the country and this test track will prove to be a milestone in the direction of the railways moving towards modernity.

Along with strengthening the infrastructure, special emphasis has also been given to protected rail operations by the Railways in the past. Apart from the railway track, rolling stock plays an important role in strengthening safety. Before using the rolling stock, it is necessary to test it extensively and intensively, only then it can meet the safety criteria.

The railways will be able to use the resources extensively and safety will increase significantly through the dedicated test track. For the comprehensive testing of high-speed rolling stock in the country, the Indian Railways is developing the country’s first RDSO dedicated test track of 60 km between Gudha-Thathana Mithdi in Nawa of Jodhpur Division, Deedwana district of Rajasthan. This railway track has been drawn from the middle of Sambhar Lake which is about 80 km from Jaipur. The work of the RDSO dedicated test track has been approved in two phases. Phase 1 work was approved in December 2018 and Phase 2 work in November 2021. The total estimated cost of this project is Rs 820 crore.

The construction of the dedicated test track includes seven big bridges, 129 small bridges and four stations (Gudha, Jabdinagar, Nawan and Mithadi). 27 km of work has been completed under this project and the target has been set to complete the entire work by December 2025. Comprehensive testing facilities of high-speed rolling stock and items including speed tests, stability, safety parameters, accident resistance, quality of rolling stock etc. are being developed under this project. This dedicated test track also includes testing of track material, bridges, TRD equipment, signalling gear and geotechnical studies. Different structures like bridges, under bridges, and over bridges have been built on the track.

RCC and steel bridges have been built on this track which are below and above the ground. New technology has been used to make these bridges vibration-resistant. The response of a train passing over it at high speed can be tested through these bridges. The bridge has been built using a turn-out system. That is, stainless steel has been used on top by installing heavy RCC boxes. Since the environment of Sambhar is alkaline, the steel will not rust. Also, the vibration of the high-speed train can be reduced. The speed will be tested by passing the bullet train through these structures. This will be the first dedicated track in the country where neighbouring countries will also be able to get their trains tested.

The railways did not have any dedicated line for the trials of coaches, engines and train racks made in India. There is a lot of traffic on all the lines. In such a situation, the schedules of many trains have to be changed for the trials. Railway officials said that not only bullet trains but also high-speed, semi-high-speed trains, and metro trains will be tested here in future. High-speed, semi-speed and metro trains can also be tested on this track. The team of RDSO i.e. Resource Design Standard Organization of the railway will monitor the trial. This same team the railway checks the fitness of the coach, bogie and engine. Before putting any coach or engine on the track, the railway checks every parameter to see if there will be vibration beyond the set speed. The response of the train on a bad track etc. will also be checked. The high-speed dedicated railway track is 60 km long, but the main line is 23 km long. It has a high-speed 13 km long loop in Gudha.

The loop is used in the railway to cross the crossing or to allow two trains coming from opposite directions to pass without any interruption. Apart from this, a quick testing loop of 3 km has been made at Nawa station and a curve testing loop of 20 km has been made in Meethadi. These loops have been made on curves of different degrees. On a bad track, the train starts to wobble and jerk. If the track gets damaged, what should be the speed and what will be its effects will be checked. For this, a 7 km long twisty track has been laid.

(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)



Source link

Nation Tags:India's 1st Dedicated Railway Test Track, Indian Railways

Post navigation

Previous Post: The Hindu Explains | How will Trump treat illegal Indians?
Next Post: India’s 1st Dedicated Railway Test Track Is Being Constructed In Rajasthan

Related Posts

  • Access Denied
    Access Denied Nation
  • Access Denied
    Access Denied Nation
  • NCSC seeks report on Mamata Banerjee’s alleged ‘derogatory’ remark against SC community
    NCSC seeks report on Mamata Banerjee’s alleged ‘derogatory’ remark against SC community Nation
  • Access Denied
    Access Denied Nation
  • Around 20 ‘unauthorised’ homes, farmhouses razed as part of road-widening drive in south Delhi
    Around 20 ‘unauthorised’ homes, farmhouses razed as part of road-widening drive in south Delhi Nation
  • Poll Body Puts Army Officer Vikrant Prasher’s J&K Police Deputation On Hold Over Model Code
    Poll Body Puts Army Officer Vikrant Prasher’s J&K Police Deputation On Hold Over Model Code Nation

More Related Articles

Access Denied Access Denied Nation
Access Denied Access Denied Nation
Access Denied Access Denied Nation
SC to hear Delhi Race Club plea against eviction on August 25 SC to hear Delhi Race Club plea against eviction on August 25 Nation
Access Denied Access Denied Nation
Promised Job, Unemployed UP Man Framed In Rs 250-Crore GST Fraud Promised Job, Unemployed UP Man Framed In Rs 250-Crore GST Fraud Nation
SiteLock

Archives

  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Delhi journalist who accused ACP of sexual harassment slapped with SC/ST Act over ‘casteist remarks’
  • Three Indians killed in Germany building fire: reports
  • Govt. to roll out National Electricity Data Sharing framework in October: Power Secretary
  • BCCI steps in to prevent further forfeitures by Arunachal Pradesh
  • TCCI seeks review of steep parking, access charges at Thiruvananthapuram airport

Recent Comments

  1. RobertTes on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. Manuelret on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. RobertTes on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. RobertTes on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. BrentWes on UP Teacher Who Asked Students To Slap Muslim Classmate
  • Access Denied Business
  • Access Denied Sports
  • Access Denied Business
  • Re-Polling To Be Held Today At 11 Booths In Manipur
    Re-Polling To Be Held Today At 11 Booths In Manipur Nation
  • Zelenskyy makes his case at the US Capitol and Pentagon for more war aid as some GOP support softens
    Zelenskyy makes his case at the US Capitol and Pentagon for more war aid as some GOP support softens World
  • Karnataka Government Bans Staff From Using Tobacco Products Inside Offices
    Karnataka Government Bans Staff From Using Tobacco Products Inside Offices Nation
  • Man arrested on charge of attempted sexual assault
    Man arrested on charge of attempted sexual assault Nation
  • Okkiyam Maduvu Canal widening improves water flow ahead of monsoon: Chennai Corporation
    Okkiyam Maduvu Canal widening improves water flow ahead of monsoon: Chennai Corporation Nation

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Associate Journalists
1. Subrata Paul - AN/2020/01
2. Quamruz Zaman - AN/2021/22
3. Ahmed Sha - AN/2021/035
4. Ajay Kumar Shaw - AN/2021/39
5. Tahqiqul Hoda - AN/2021/21

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.