Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • YouTube
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • Daily Quiz: On rationalists – The Hindu
    Daily Quiz: On rationalists – The Hindu World
  • Overton makes a big impression with his pace and variations
    Overton makes a big impression with his pace and variations Sports
  • Canada, China set for ‘historic’ gains from new partnership, says Mark Carney
    Canada, China set for ‘historic’ gains from new partnership, says Mark Carney World
  • An industrial risk the Qatar blast shares with accidents in India | Explained
    An industrial risk the Qatar blast shares with accidents in India | Explained Science
  • FPI selling spree continues, pull out ₹49,340 crore in June
    FPI selling spree continues, pull out ₹49,340 crore in June Business
  • India’s Squad For England Series: Massive Blow For BCCI And Team India, 156.7 Kmph Pacer Mayank Yadav Set To Miss: Report
    India’s Squad For England Series: Massive Blow For BCCI And Team India, 156.7 Kmph Pacer Mayank Yadav Set To Miss: Report Sports
  • Clustering maize plants together can improve their insect resistance
    Clustering maize plants together can improve their insect resistance Science
  • S Jaishankar In US Amid Row With Canada Over Khalistani Terrorist Murder
    S Jaishankar In US Amid Row With Canada Over Khalistani Terrorist Murder Nation
Five flyover, underpass works along 15-km stretch leave over 5 lakh commuters battling traffic on Mumbai Highway

Five flyover, underpass works along 15-km stretch leave over 5 lakh commuters battling traffic on Mumbai Highway

Posted on June 9, 2026 By admin


Construction work is under way at the Novopan junction, where main carriageways on either side have been closed and traffic diverted onto temporary two-lane service roads.
| Photo Credit: By Arrangement

With construction work on for four flyovers and an underpass on a 15-kilometre stretch of the Mumbai Highway (NH-65), more than five lakh commuters travelling through one of Telangana’s busiest industrial corridors are contending with daily bottlenecks, diversions and shrinking road space.

The traffic is affected on the corridor from ICRISAT, near BHEL Township to Ganesh Gadda, where flyovers are being built at Isnapur X roads, Lakdaram junction, Rudraram and Ismailkhanpet, along with an underpass at Novopan junction.

At Novopan junction, construction of retaining walls for the vehicle underpass has gathered pace and the carriageways on either side have been closed and traffic diverted onto temporary two-lane service roads measuring only about eight to 10 metres in width.

Traffic diversions in place between Patancheru and Sangareddy where construction activity is under way.

Traffic diversions in place between Patancheru and Sangareddy where construction activity is under way.
| Photo Credit:
By Arrangement

Vehicles travelling from the ORR and Sangareddy towards Patancheru are being routed through the left-side service road from Pocharam Kaman up to Patancheru Vegetable Market Road before rejoining NH-65. Traffic in the opposite direction is being diverted from Incor Lake City Apartments up to Ramky Infra Tower before merging back onto the highway.

The stretch in Patancheru, now under Cyberabad police commissionerate, serves as a critical artery linking Hyderabad with Sangareddy and further towards Maharashtra and Karnataka, while also supporting daily movement to some of State’s largest industrial clusters. Traffic police estimate that over 5 lakh commuters use the corridor every day. This includes around 2 lakh employees in the pharmaceutical and manufacturing units located in IDA Patancheru and IDA Pashamylaram.

School and college buses and heavy goods vehicles transporting raw materials and finished products form another major share of traffic of traffic on the road. More than one lakh migrant workers residing in localities such as Isnapur and Chitkul and employed in brick kilns, construction sites and smaller industrial establishments also use the corridor. The resulting mix of industrial traffic, employee transport, educational institution buses and freight movement leaves little room for traffic absorption when lanes are reduced for construction activity.

Patancheru Traffic Inspector Ashok said the simultaneous execution of multiple projects have created traffic management challenges. “We have less staff and more works happening here. About 20 personnel are managing this stretch, with around 10 members deployed in each shift,” he said.

According to him, Novopan and Isnapur remain the most congested locations while other pressure points include the Sri Siddhi Vinayaka Temple area in Rudraram, which witnesses significant daily footfall, and Muthangi near ORR exit 3, where residential and commercial traffic continues to grow.

Sangareddy District Collector Prateek Jain, SP Paritosh Pankaj, Patancheru traffic officials and National Highway authorities carried out inspections at the Novopan junction where construction activity gathered pace in May end.

Sangareddy District Collector Prateek Jain, SP Paritosh Pankaj, Patancheru traffic officials and National Highway authorities carried out inspections at the Novopan junction where construction activity gathered pace in May end.
| Photo Credit:
By Arrangement

Patancheru Inspector G. Vinayak Reddy said traffic congestion is severe between 8 a.m. and 10 a.m. and again from 5 p.m. to 8 p.m. when industrial employees travel to and from work, necessitating the deployment of law and order personnel alongside traffic police and marshals.

Officials estimated that commuters experience delays ranging from 15 to 30 minutes on most days. “I preferred driving to work, but with the ongoing construction, I have switched to the company bus.. After crossing Patancheru, there is still the IT traffic to deal with before I reach home in Chandanagar,” said R. Priyadarshini, a pharmaceutical employee who commutes daily to Pashamylaram.

Deputy Executive Engineer Ramakrishna of the National Highways wing of the Telangana Roads and Buildings (R&B) department said the target was to complete the construction works by March 2027. “Some land acquisition issues remain at certain locations. There are religious structures as well as residential properties at places such as Muthangi and Isnapur where land acquisition is still required,” he said.

He said land constraints had affected the sequencing of construction activities. “The service roads were to be completed first before work began on the main carriageway. Because of land restrictions, we have had to undertake both simultaneously in some locations, which has increased inconvenience for road users,” he said.

Published – June 09, 2026 07:13 pm IST



Source link

Nation Tags:IDA Patancheru, Kothareddypally and Madinaguda highway upgradation, Mumbai Highway, NH-65 traffic congestion, Novopan Junction, Outer Ring Road (ORR), Patancheru flyover works

Post navigation

Previous Post: Ancy Sojan seeks consistency ahead of big events
Next Post: JPC on Corporate Laws (Amendment) Bill calls for views on bill from stakeholders

Related Posts

  • Access Denied
    Access Denied Nation
  • Couple Arrested For Speeding SUV With Cop On Bonnet, Nearly Killing Him In Gujarat
    Couple Arrested For Speeding SUV With Cop On Bonnet, Nearly Killing Him In Gujarat Nation
  • BRS’ K Kavitha To Skip CBI Summons, Cites Pending Supreme Court Petition
    BRS’ K Kavitha To Skip CBI Summons, Cites Pending Supreme Court Petition Nation
  • Amit Shah Targets Sharad Pawar, Uddhav Thackeray
    Amit Shah Targets Sharad Pawar, Uddhav Thackeray Nation
  • Did Delhi Officer’s Son Sexually Abuse Teen Too? What Cops Said
    Did Delhi Officer’s Son Sexually Abuse Teen Too? What Cops Said Nation
  • Will not allow pilferage of offerings: Supreme Court on ‘siphoning’ of donations at Banke Bihari Temple
    Will not allow pilferage of offerings: Supreme Court on ‘siphoning’ of donations at Banke Bihari Temple Nation

More Related Articles

Delhi Elections 2025 Date Announcement: Schedule To Be Released Shortly Delhi Elections 2025 Date Announcement: Schedule To Be Released Shortly Nation
Maharashtra BJP MLA Resigns In Support Of Maratha Quota Demand Maharashtra BJP MLA Resigns In Support Of Maratha Quota Demand Nation
Access Denied Access Denied Nation
Access Denied Access Denied Nation
3 Arrested In UP’s Kushinagar For Allegedly Gang-Raping Teen In Moving Car 3 Arrested In UP’s Kushinagar For Allegedly Gang-Raping Teen In Moving Car Nation
Access Denied Access Denied Nation
SiteLock

Archives

  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Congress slams IIM Jammu for fining students absent from PM’s birthday event
  • football friendly – The Hindu
  • Road sweeping machine restored to service in Erode
  • Undercover and Trail Blazer impress
  • Not in favour of FIRs against farmers over stubble burning: Punjab CM Mann

Recent Comments

  1. AlvinNet on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. AlvinNet on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. Jamesslits on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. MichaelClear on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. Jamesslits on UP Teacher Who Asked Students To Slap Muslim Classmate
  • 2025’s Hottest Dating Trends Revealed: Survey Highlights Micromance, Future-Proofing
    2025’s Hottest Dating Trends Revealed: Survey Highlights Micromance, Future-Proofing World
  • In poll-bound Delhi, Shah says Budget has made Purvanchalis, middle class happy
    In poll-bound Delhi, Shah says Budget has made Purvanchalis, middle class happy Business
  • Access Denied
    Access Denied Nation
  • Rupee rises 25 paise to close at 87.84 against U.S. dollar
    Rupee rises 25 paise to close at 87.84 against U.S. dollar Business
  • US Supreme Court Denies Trump Bid To Halt Sentencing In Hush Money Case
    US Supreme Court Denies Trump Bid To Halt Sentencing In Hush Money Case World
  • Kamalini’s fifty, spinners’ precision guide India to U19 T20 WC final, to face SA for title
    Kamalini’s fifty, spinners’ precision guide India to U19 T20 WC final, to face SA for title Sports
  • Watch: Unhappy Babar Azam Asks Reporters To Stop Calling Him ‘King’
    Watch: Unhappy Babar Azam Asks Reporters To Stop Calling Him ‘King’ Sports
  • Access Denied Sports

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.