Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • YouTube
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • How Albert Theatre became Madras’ cultural landmark
    How Albert Theatre became Madras’ cultural landmark Nation
  • Qatar’s mediator role critical as fate of Israeli hostages hangs in the balance
    Qatar’s mediator role critical as fate of Israeli hostages hangs in the balance World
  • Access Denied
    Access Denied Nation
  • Access Denied Business
  • “World Seeing A Situation Of Return To Conflict”: Army Chief
    “World Seeing A Situation Of Return To Conflict”: Army Chief Nation
  • Access Denied Business
  • U.S. woman among 18 NGO staff detained in Afghanistan
    U.S. woman among 18 NGO staff detained in Afghanistan World
  • Access Denied
    Access Denied Nation
NUPPL’s Ghatampur plant Unit-2 begins commercial operations

NUPPL’s Ghatampur plant Unit-2 begins commercial operations

Posted on December 10, 2025 By admin


Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture between NLC India Limited (NLCIL) and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited has commenced Commercial Operation Declaration (COD) of Unit-2 (660 MW) of the 1,980 MW Ghatampur Thermal Power Project.

According to NLCIL, the Unit-2 was successfully synchronized with the 765 kV grid on July 20, 2025, in a single attempt, immediately following the completion of the steam blowing milestone. Thereafter, the Unit has witnessed a swift and seamless progression from synchronization to full operational readiness. 

The 72-hour full-load trial operation of Unit-2 was completed successfully in the first attempt in a smooth and uninterrupted manner, within 19 days from the date of first coal firing.

This culminated in the successful declaration of Commercial Operation (COD), effective on December 09, 2025, reflecting the highest standards of project execution, coordination, and teamwork across all stakeholders.

According to an NLCIL press note, with this milestone, two units (Unit-1 & Unit-2), totalling 1,320 MW, are now under commercial operation, significantly enhancing reliable and sustainable power supply to the states of Uttar Pradesh and Assam.

Prasanna Kumar Motupalli, Chairman and Managing Director, NLC India Ltd, said: “The declaration of COD for Unit-2 is a testament to the focused and dedicated efforts of Team NUPPL, NLCIL, UPRVUNL and all contracting partners. This achievement has been made with the unwavering support of the Ministry of Coal, Government of India and Government of Uttar Pradesh. This further strengthens our commitment to nation-building through reliable energy supply.”

The Unit-1 (660 MW) of the Ghatampur Thermal Power Plant (GTPP) was successfully commissioned and commenced its commercial operation on December 12, 2024. 

Till date, Unit-1 of this project has generated 4449.84 MUs of electricity, resulting in revenue of ₹2638.69 crore. 

With Unit-2 commercially operational, the project is firmly on track for completion of the third and final unit in FY 2025-26, taking the total capacity to 1,980 MW.

The power generated from the project is catering to the growing electricity demand of the nation and boosting the economy particularly of Uttar Pradesh. 

Upon commissioning of all three units, the project is expected to generate 14,743.08 MUs annually, which will meet the energy requirements of approximately 12 million average Indian households annually. Consequently, the project will also witness a significant increase in annual revenue to ₹ 8,453.3 crore in a year.

Presently, as per the power allocation by Ministry of Power, 93.11% of power generated from this project is allocated to Uttar Pradesh. Further, balance power from this project is being allocated to various states, promoting inter-state energy equity. 

The project underscores NUPPL’s commitment to environmental sustainability, incorporating supercritical boiler and turbine-generator sets, Flue Gas Desulphurization (FGD), Selective Catalytic Reduction (SCR) technologies, and Zero Liquid Discharge systems to meet stringent environmental standards.

NUPPL is also progressing steadily with the development of the captive Pachwara South Open cast project (PSOCP) in Dumka district, Jharkhand, which will provide a sustainable fuel source for the power plant. 

The commencement of coal production from PSOCP is anticipated from FY2025-26 in phased manner, NLCIL said.

EOM

Published – December 10, 2025 02:18 pm IST



Source link

Business Tags:Ghatampur power plant, Ghatampur Thermal Power Station, Neyveli Lignite Corp

Post navigation

Previous Post: Access Denied
Next Post: IndiGo crisis: Delhi HC tells airline to begin passenger compensation, flags surge in airfares

Related Posts

  • RBI to enable UPI for cash deposit facility, to allow foreign investors in IFSC to invest in Sovereign Green Bonds
    RBI to enable UPI for cash deposit facility, to allow foreign investors in IFSC to invest in Sovereign Green Bonds Business
  • Markets drop in early trade dragged by Infosys, Axis Bank
    Markets drop in early trade dragged by Infosys, Axis Bank Business
  • Access Denied Business
  • Tata Capital unveils pan-India phygital expansion
    Tata Capital unveils pan-India phygital expansion Business
  • Watch: Budget 2024 | What’s in it for women and children?
    Watch: Budget 2024 | What’s in it for women and children? Business
  • Govt rules out permitting sugar exports this season
    Govt rules out permitting sugar exports this season Business

More Related Articles

Access Denied Business
Access Denied Business
How Can Mumbai Indians Qualify For WPL 2026 Playoffs: Scenarios Explained Business
Granules Life Sciences secures first U.S. FDA approval Granules Life Sciences secures first U.S. FDA approval Business
Access Denied Business
Cognizant, Infosys, TCS, Wipro deploy over 200,000 Microsoft Copilot licences Cognizant, Infosys, TCS, Wipro deploy over 200,000 Microsoft Copilot licences Business
SiteLock

Archives

  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Gold ETF prices revive as investors flock on higher import duties on yellow metal
  • Kashmir MLA ‘boycotts’ L-G’s drug campaign after demolition drive in his constituency
  • Assam ships first legal agarwood chips to West Asia
  • How the anti-defection law is going to operate in the AIADMK case?
  • ATS questions 57 in Maharashtra over alleged gangster network links

Recent Comments

  1. Stevemonge on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. RichardClage on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. StevenLek on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. Leonardren on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. NathanQuins on UP Teacher Who Asked Students To Slap Muslim Classmate
  • India’s home Test failures not coach’s fault: Raina backs Gambhir
    India’s home Test failures not coach’s fault: Raina backs Gambhir Sports
  • Access Denied Sports
  • Access Denied World
  • Access Denied Sports
  • Access Denied Sports
  • Access Denied Business
  • Access Denied Business
  • SpaceX’s Starship Mega-Rocket “Lost” During Atmospheric Re-Entry
    SpaceX’s Starship Mega-Rocket “Lost” During Atmospheric Re-Entry World

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.