Zojila Tunnel – Artifex.News https://artifex.news Stay Connected. Stay Informed. Sat, 13 Jun 2026 20:59:00 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.2 https://artifex.news/wp-content/uploads/2026/05/cropped-cropped-app-logo-32x32.png Zojila Tunnel – Artifex.News https://artifex.news 32 32 In Zojila, light at the end of tunnel https://artifex.news/article71094344-ecerand29/ Sat, 13 Jun 2026 20:59:00 +0000 https://artifex.news/article71094344-ecerand29/ Read More “In Zojila, light at the end of tunnel” »

]]>

On June 9, when the 13.14-kilometre-long Zojila Tunnel witnessed a construction breakthrough, Muhammad Shafi Sagar, 50, and Ashiq Wazir, 30, unknown to each other, experienced both relief and sadness. Relief that they and their friends will, in a couple of years, be able to travel between Ladakh’s Drass district and the Kashmir Valley relatively free of the fear of dangerous terrain. Sadness, because they had both lost loved ones in the treacherous Zojila Pass.

The Zojila Tunnel by-passes the pass that runs across 30 km, cutting through the vertical, craggy Himalayan range in Drass. In the district’s Pandrass village, the mountains are parallel walls; there are no trees in sight at this altitude of 10,800 feet. In winter, the temperature drops to less than -25 degrees Celsius. In summer, the peaks are still surrounded by snow, but the melting glaciers relent. They spring out waterfalls from elevated mountain sides, adding to the roar of the Drass river below.

Shepherds from the plains converge on the high-altitude meadows dotted with wild grass and fresh-water bodies. The children are out in Pandrass High School, the sun shining brightly over them and their L-shaped, single-storey campus, but piercing gusts still make wearing a wind-blocker necessary. The night temperature continues to dropbelow freezing point, even in June.

It is in these conditions that 1,200 people, working from a camp site, have been building the Zojila Tunnel, which will connect Baltal in Kashmir’s Ganderbal district and Minamarg in Ladakh’s Drass, on National Highway-1. In the past, the pass was rife with tragedy.

“Shooting stones, snow slides, sudden temperature dips, and avalanches have killed travellers on the Zojila Pass for centuries. Kargil (in Ladakh) is full of stories of loss and disappearances,” says Sagar, a teacher at the Pandrass High School, who is also an author of a book on the culture of the Shina tribe in Ladakh.

Officials during the inspection and breakthrough of Zojila tunnel, at Minimarg, in Ladakh, Tuesday, June 9, 2026.

Officials during the inspection and breakthrough of Zojila tunnel, at Minimarg, in Ladakh, Tuesday, June 9, 2026.
| Photo Credit:
Imran Nissar

Workers and technicians, mostly from India, but also from abroad, put in 10 million safe working hours. They grappled with the geological uncertainties of young mountains, rock classification changing every couple of hundred metres, and water pouring out of crevices. Built at a cost of ₹6,800 crore, the excavation was carried out between the altitudes of 2,900 metres on the Kashmir side to 3,310 metres on the Ladakh side. It is expected to be operational by 2028, and is designed to stay open through the year.

Danger zone  

Sagar tells a story about his colleagues, from 33 years ago. In 1993, the Pandrass High School, located 13 km away from the Zojila Pass, closed for its usual five-month-long winter vacation in December. Two teachers, Shabir Ahmad and Bashir Ahmad, decided to return home to the Kashmir valley. The Union Territory of Ladakh was part of the Kashmir division of the erstwhile State of Jammu and Kashmir till 2019.

“Winter had already set in. The two teachers left for home. The sub-zero temperatures near the Zojila Pass killed them. One body was recovered after a week and another body has not been traced to date. Locals feel wild animals may have taken it,” says Sagar.

For Sagar, the tunnel has provided a new lease of life to people who live here. “When a local would fall sick and need specialised treatment, the nearest hospital was 279 km away, in Leh. Then the patient would be flown out to Delhi or Srinagar. With the tunnel, it’ll be just a 141-km drive to Srinagar,” says Sagar. The worries about vegetables, gas, and grocery stocks will be stories from the past.

This year on March 27, despite better road management and early warnings compared to the past, an avalanche killed seven persons and injured five others at the Zojila Pass. It was a sudden bright sun that triggered the rockfall around 12.30 p.m. One of the victims of the dread-inducing Zojila Pass was Akbar Ali Shadab, a 36-year-old resident of Tharumsa Pashkum village in Kargil. Shadab had just had a baby, six months before. He worked as a wildlife guard and was respected for his volunteerism.

“News flashed on social media about four vehicles being hit by an avalanche. We reached the spot in the evening. The rescue teams halted operations for the night. My uncle’s body was found around 6 the next morning,” says Wazir, the victim’s nephew.

Now, the conversation around Zojila is changing. Sajjad Kargili, in-charge of political affairs of the Jamiat Ul Ulama Isna Asharia, Kargil, an influential seminary, sees the tunnel as the “realisation of a decades-long dream of locals”. He refers to the many leaders who through the years have asked at both the State and Central levels for the tunnel.

Kargili was joined by senior members of the seminary on June 9 to pay tribute “to all those who dedicated their lives to this cause but could not live to witness this historic moment”. He remembers those who disappeared or died.

“This is not just an engineering milestone, but also a testament to sacrifices. The historic breakthrough stands as a landmark achievement in a long journey of struggle, hope, and determination. It opens a new chapter of connectivity, progress, and prosperity for the region,” says Kargili.

A tourist vechile inside the tunnel during the inspection and breakthrough.

A tourist vechile inside the tunnel during the inspection and breakthrough.
| Photo Credit:
Imran Nissar

Upto 80% of those working on the site are locals. With the tunnel aiming to be open through winter, the possibility of tourism through the year has opened up.

Scaling heights  

Ladakh’s Zojila Pass has historically been daunting for India. During the India-Pakistan war of 1947, the it was choked by Pakistan and it took two months in 1948 to drive tanks in, between September and October, to defeat and evict the Pakistan Army. The war spurred construction work on the Zojila Pass to make it motorable. “After the 1962 India-China war, the focus again shifted to the Zojila Pass and its importance. The road saw further widening and attention,” say Sagar.

From 2005 to 2019, attempts to award the project failed four times. The project was shelved in 2019 due to financial losses of the company tendered to do the work. The work on the Zojila Tunnel saw a flip in its speed after India and China engaged in a face-off in Galwan on June 15-16 in 2020, and saw casualties on both sides for the first time since the wars of the 1960s.

On October 15, 2020, the construction of the Zojila Tunnel was started by the National Highways and Infrastructure Development Corporation Limited (NHIDCL) and Megha Engineering & Infrastructures Ltd (MEIL). The first blasting at Nilgrar Tunnel was held on October 14, 2020. Approach roads, bridges, the Nilgrar twin tunnels, cut-and-cover works, and snow gallery (to protect the tunnel from heavy snowfall) were constructed to set the stage for the tunnel work.

Six years down the line, the Zojila Tunnel is tipped to be the world’s longest single-tube bidirectional road tunnel at an altitude 11,578 feet. The main tunnel is U-shaped and is 9.5 metres wide and 7.57 metres in height.

Harsh weather conditions coupled with the mountain’s rock composition posed a major challenge for engineers and workers. The rock classification changed 67 times across the 13.14 km stretch and shifted constantly between good and poor formations. The highly volatile geology was managed with the expertise of skilled crew.

“The Himalayas are considered young mountains. They are just 700 million years old,” says Yousef Es’haghpour Rahimabadi, an Iranian engineer who works for the NHIDCL. “The rocks have not solidified or condensed fully yet. We had to work on eight to 10 fault zones, which needed special measures. Water seepage has been a major concern,” he adds.

He has 29 years of experience in building tunnels. “I mostly worked in the Middle East,” says Rahimabadi, who provided consultation on design as well as at-site solutions.

Rahimabadi says the age of the tunnel is set to be 100 years. During the construction of the project, workers braved temperatures of -20 degree Celsius for nearly 100 days a year. A base camp was established for over 1,100 people, which provided food climate- appropriate food, medical facilities, transportation, and amenities to sustain round-the-clock operations.

A Spanish company also joined the project to provide expert solutions to problems posed by the geology of the mountains.

Over the last five years, the project site faced five major avalanches, two in 2023, two in 2024, and one in 2025. On January 12, 2023, a severe avalanche hit the Sarbal area close to the Nilgrar Tunnels. On January 15, 2023, up to 172 workers were stranded in an avalanche.

To combat heavy snow accumulation in winter, a fleet of small and large snow blowers was deployed. This ensured uninterrupted construction work while simultaneously keeping the highway open for regular vehicular movement. “Procurement was also a major challenge. It took three months to bring gantries to Minamarg, because the bypass in Sonamarg was closed for winter,” says Rahimabadi.

The tunnel in numbers

30.894 km Total project length, including tunnel roads and bridges

13.153 km Zojila main tunnel length

460 metres Length of three bridges across xx

474.30 metres India’s longest shaft

2.35 km of seven cut-and-cover structures as protection from landslides

Gantries are a huge adaptable moulds designed for shaping concrete within a tunnel excavation. Rahimabadi credits the New Austrian Tunnelling Method (NATM), which applies the sequential excavation method. “The NATM method uses the blast-and-go-ahead technique. We worked in two shifts in 24 hours to ensure that the deadline was met,” says Rahimabadi.

The tunnel has vertical structures to provide fresh air ventilation and emergency safety since there is no separate escape route. It offers automatic and emergency lighting, emergency phone and radio connectivity, and message signalling to ensure the safety of travellers. Vehicles will be able to travel at a speed of 80 km per hour through it. From two hours to cross the Zojila Pass, it will take travellers 30 to 40 minutes to cross the mighty and arduous Himalayan range.

Change at the press of a button  

Harpal Singh, chief operating officer of Megha Engineering, recalls spotting batches of bears hibernating close to tunnel mouths in winter. “We would ignore each other. We did not try to disturb their habitat.” He also talks about the desolate landscape, when people from Sonamarg would leave in winter. “We’d see only the police and the Army patrolling,” says Singh.

Zojila Tunnel has an immense strategic value for India. India shares a 3,488-km-long border with China, of which 1,597 km runs through Ladakh. Besides the threats posed by China to the east, Pakistan is to the west of Ladakh, beyond the Line of Control.

“Earlier, the Zojila Pass would face closure for five to six months due to snowfall. This tunnel will provide an all-weather link with Ladakh and help the Army,” says Singh.

The completion of the Zojila Tunnel project has come at a time when massive military activities are being noted on the borders of Ladakh by China and in Gilgit and Baltistan by Pakistan.

When Union Minister of Road Transport and Highways Nitin Gadkari on June 9 pressed the button for the final blast inside the tunnel, he underlined the strategic value of the tunnel. “From the perspective of national security, this project will prove to be a gamechanger. With round-the-year connectivity, the movement of the Indian Army, as well as the supply of Army materials, equipment, and logistics, will become faster, safer, and more effective, thereby strengthening the country’s strategic preparedness,” he said.

Above the booming government voice is that of a school teacher. “The tunnel may dilute local culture. Modernity will pose a challenge to old ways of life in Drass. Tourism will introduce new ways of construction,” says a worried Sagar.



Source link

]]>
Landmark feat: ‘Breakthrough’ in Zojila tunnel achieved https://artifex.news/article71079665-ecerand29/ Tue, 09 Jun 2026 07:28:00 +0000 https://artifex.news/article71079665-ecerand29/ Read More “Landmark feat: ‘Breakthrough’ in Zojila tunnel achieved” »

]]>

Union Minister of Road Transport and Highways Nitin Gadkari, Jammu and Kashmir CM Omar Abdullah pose in front of the Zojila tunnel, India’s longest road tunnel project connecting Jammu and Kashmir with the Ladakh region on June 9, 2026. J&K Lieutenant Governor Manoj Sinha is also seen.
| Photo Credit: AFP

Zojila Tunnel saw the light of the day on Tuesday (June 9, 2026) after a breakthrough was achieved through a blast as one of the most ambitious infrastructure projects in the country, the world’s longest single-tube bi-directional bypass at a record height, nears completion.

“Breakthrough in the 2.5 metre distance in the tunnel has been successfully achieved,” officials said.

The breakthrough has brought the decades-old dream of all-weather connectivity between the Kashmir Valley and Ladakh closer to reality.

Union Minister for Road Transport and Highways Nitin Gadkari pressed the remote button, blasting the breakthrough site near the East Portal of the tunnel at Minimarg in Ladakh Union Territory.

Jammu and Kashmir Lieutenant Governor Manoj Sinha and Chief Minister Omar Abdullah were also present.

Officials of the National Highways and Infrastructure Development Corporation Limited (NHIDCL) said the breakthrough is six months ahead of schedule.

The officials said the tunnel is likely to be thrown open for public in February 2028.

After the breakthrough, the civil works will take another 7-8 months and then the electrical works will begin, they said.

As of now, about 85% of the total work has been completed, Authority Engineer for the project, Yousef Es’haghpour Rahimabadi, told PTI in Ladakh.

The tunnel — 9.5 metre wide, 7.57 metre high, 13.153 km long — is a horseshoe-shaped single-tube, a two-lane road tunnel built at the height of around 11,578 feet above sea level.

The geostrategically important tunnel on the Srinagar-Leh National Highway will provide year-round, weather-proof connectivity to Ladakh, and reduce the earlier 1-1.5 hours travel time to just a 15-minute drive, officials said.

The tunnel from Baltal in the Ganderbal district of central Kashmir to Minimarg in Drass district of the Union Territory of Ladakh has an 18-km approach road.

Megha Engineering and Infrastructure Limited (MEIL), the agency which is executing the project, used the New Austrian Tunnelling Method (NATM) to pierce through the Himalayas and navigate the fragile geology. The entire project is 31-km-long, including the approach road and bridges, stretching from Sonmarg to Minimarg.

Once operational, the tunnel would enhance both civilian and military mobility across the treacherous Zojila Pass that is usually rendered shut for traffic for three winter months due to heavy snowfall.



Source link

]]>
What is Zojila Tunnel? All you need to know about the all weather tunnel in Ladakh https://artifex.news/article71079326-ecerand29/ Tue, 09 Jun 2026 05:17:00 +0000 https://artifex.news/article71079326-ecerand29/ Read More “What is Zojila Tunnel? All you need to know about the all weather tunnel in Ladakh” »

]]>

India’s ambitious, strategic, all weather Zojila Tunnel in seismic Zone IV is set to witness its final breakthrough on June 9, 2026, with Union Minister for Road Transport and Highways Nitin Gadkari overseeing the last round of blasting from the Kargil side.

Mr. Gadkari will preside over the blasting of the final block, marking a key milestone in the execution of the project.

What is the Zojila Tunnel?

The 13.14 km tunnel cuts through the Himalayas at an altitude of 11,578 feet and connects the Kashmir Valley with Kargil in Ladakh.

The horseshoe shaped, single tube tunnel is 9.5 metres wide and 7.57 metres high, and is designed as a two lane road passage at an elevation of about 11,578 feet above sea level.

Located on the Srinagar Leh National Highway, the project is of considerable geostrategic significance. It is expected to provide all weather connectivity to Ladakh and reduce travel time from over an hour to about 15 minutes, officials said.

The tunnel runs from Baltal in Jammu and Kashmir’s Ganderbal district to Minimarg in the Drass sector of Ladakh, with an 18 km approach road. The overall project spans 31 km, including roads and bridges, from Sonamarg to Minimarg.

Megha Engineering and Infrastructure Limited (MIEL) is executing the project using the New Austrian Tunnelling Method to navigate the region’s fragile geological conditions.

Advanced safety features

The tunnel incorporates advanced safety systems, including a semi transverse ventilation mechanism to ensure steady airflow.

It is equipped with a Smart Tunnel system based on SCADA, along with CCTV surveillance, radio control, uninterrupted power supply and ventilation systems.

Once operational, it will improve civilian and military mobility across the Zojila Pass, which remains closed for nearly three months each winter due to heavy snowfall.

Strategic significance

The Zojila Tunnel, regarded as one of the longest single tube bi-directional road tunnels at this altitude, is expected to be a strategic asset for Ladakh, which lies between Pakistan to the west and China to the east.

The region assumed heightened importance after the Kargil conflict of 1999 and subsequent tensions along the Line of Actual Control, including the 2020 stand off.

Limited connectivity during winter months has historically posed challenges for logistics and deployment. The tunnel is part of a broader effort to create multiple strategic access routes to Ladakh. These include the Rohtang corridor linking Himachal Pradesh, the proposed connectivity through the Zanskar region, and the Zojila axis connecting Jammu and Kashmir.

Together, these corridors are expected to strengthen military mobility and logistical preparedness.

All weather connectivity

The tunnel bypasses the Zojila Pass, which is prone to landslides and rockfall and remains inaccessible in winter.

During the Kargil conflict, the Srinagar Kargil highway was vulnerable to shelling, particularly in the Drass sector. This affected the movement of troops and supplies during the 53 day conflict.

Efforts to improve alternative access, including the Ladakh Himachal axis, have helped but remain season dependent, typically opening in May and closing by November.

The Zojila Tunnel is expected to address this limitation by ensuring uninterrupted connectivity throughout the year.

Reduced travel time and logistics support

The project, estimated to cost over ₹6,800 crore, will significantly cut travel time between Ganderbal and Kargil from about three hours to around 20 minutes, officials said.

The tunnel infrastructure includes four culverts, four Nilgrar tunnels, eight cut and cover sections and a vertical ventilation shaft of about 220 metres. The western portal is located at Baltal and the eastern portal at Minimarg.

Once operational, the tunnel is expected to facilitate year round transport of supplies to high altitude areas in Ladakh. At present, provisions for winter months are largely pre positioned in advance ahead of snowfall.

Security forces in Ladakh depend heavily on surface connectivity for the movement of goods and personnel. The project lies along National Highway 1, with elevations ranging from about 2,700 metres to 3,300 metres, linking Sonamarg in Jammu and Kashmir to Minimarg in Ladakh.

Published – June 09, 2026 10:47 am IST



Source link

]]>
2nd-Biggest Donor Bought Some Electoral Bonds Close To Bagging Contracts https://artifex.news/megha-engineering-made-some-electoral-bond-purchases-close-to-bagging-contracts-5291971rand29/ Fri, 22 Mar 2024 16:13:10 +0000 https://artifex.news/megha-engineering-made-some-electoral-bond-purchases-close-to-bagging-contracts-5291971rand29/ Read More “2nd-Biggest Donor Bought Some Electoral Bonds Close To Bagging Contracts” »

]]>

The Hyderabad-based firm purchased electoral bonds worth Rs 966 crore.

New Delhi:

Megha Engineering and Infrastructure Ltd made a number of electoral bond purchases close to the date of bagging crucial projects, including the all-weather Zojila tunnel that is being constructed at an estimated cost of Rs 4,500 crore in Jammu and Kashmir.

Hyderabad-based Megha Engineering and Infrastructure Ltd (MEIL) has emerged as the second-biggest buyer of electoral bonds worth Rs 966 crore, according to data released by the Election Commission of India (ECI) on Thursday.

The unlisted firm donated the highest amount of about Rs 585 crore to the BJP, followed by Rs 195 crore to BRS, and Rs 85 crore to the DMK.

As per available information, MEIL had bought bonds worth Rs 20 crore in October 2020.

The company secured the project to construct Asia’s longest bi-directional road tunnel project in the Union Territory of Jammu and Kashmir in the October-November period of the same year.

In March 2023, MEIL had bagged a Rs 3,681 crore project for construction of a bullet train station at the Bandra Kurla Complex (BKC) in Mumbai.

As per the ECI, the company made its highest purchase of bonds totalling Rs 140 crore in the very next month – April 2023.

According to a company statement earlier, MEIL bagged a Rs 4,358 crore Polavaram project in November 2019 in Andhra Pradesh in a reverse tendering process initiated by the state government.

MEIL had bought bonds worth Rs 5 crore in October 2019, the ECI data showed.

The company also has several projects in Uttar Pradesh, Uttarakhand, Gujarat, and Madhya Pradesh, among others.

It has also donated to the Bharat Rashtra Samithi (BRS), which until recently was in power in Telangana. The BRS, formerly known as Telangana Rashtra Samithi, got Rs 195 crore as donations from the company.

MEIL donated bonds worth Rs 85 crore to the DMK, the ruling party in Tamil Nadu, and Rs 37 crore to the Jagan Mohan Reddy-led YSR Congress Party in Andhra Pradesh.

The TDP got about Rs 25 crore from the company, while the Congress got Rs 17 crore.

The JD(S), Jana Sena Party and the JD(U) received smaller sums ranging from Rs 5 crore to Rs 10 crore from the company.

A query sent to the company seeking its reaction on the development remained unanswered.

The unlisted private firm was founded in 1989 by industrialist Pamireddy Pitchi Reddy as Megha Engineering Enterprises, manufacturing pipes for municipalities.

It changed its name to Megha Engineering and Infrastructure in 2006 and went on to execute big infrastructure projects like dams, natural gas distribution networks, power plants and roads.

(Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)



Source link

]]>