Hyderabad traffic – Artifex.News https://artifex.news Stay Connected. Stay Informed. Tue, 29 Sep 2026 06:26:00 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.3 https://artifex.news/wp-content/uploads/2026/05/cropped-cropped-app-logo-32x32.png Hyderabad traffic – Artifex.News https://artifex.news 32 32 Khajaguda junction restrictions may push traffic onto internal roads; Cyberabad Police map three alternative routes https://artifex.news/article71521011-ecerand29/ Tue, 29 Sep 2026 06:26:00 +0000 https://artifex.news/article71521011-ecerand29/ Read More “Khajaguda junction restrictions may push traffic onto internal roads; Cyberabad Police map three alternative routes” »

]]>

For commuters passing through Khajaguda Junction, the familiar turn towards Nanakramguda may no longer be the quickest way home or to work for the next two months. Traffic restrictions imposed for water pipeline works are set to push vehicles through internal and alternative roads around one of the busy links to Hyderabad’s western corridor.

The restrictions are in place for 60 days from September 26 to facilitate works on 900 mm and 1,000 mm diameter water pipelines, according to an advisory issued by Cyberabad Traffic Police.

The impact

The immediate impact will be felt by motorists travelling towards Nanakramguda. The service road and free-left movement from KIMS Hospital towards Nanakramguda Road will be temporarily closed. Vehicles approaching Khajaguda Junction from the Biodiversity side will also not be allowed to take the usual right turn towards Nanakramguda Road.

With these movements cut off, police have warned commuters to expect congestion in and around Khajaguda Junction and plan their journeys accordingly.

Three approaches, different detours

Those approaching from the Shaikpet flyover side will have to leave the usual stretch before KIMS Hospital and take Timberlake Colony Road to connect towards Nanakramguda Road. The diversion map issued for motorists from the Shaikpet flyover shows traffic being taken around the Khajaguda-Malkam Cheruvu side before reconnecting with the Khajaguda-Nanakramguda Road.

The route changes for motorists travelling beneath the Shaikpet flyover are different. They have been advised to take the High-Tension Road to bypass the affected junction. The Traffic Police’s map traces the alternative movement from the Old Mumbai Highway side towards Khajaguda-Nanakramguda Road through the roads around Malkam Cheruvu and Chitrapuri Colony.

Commuters arriving from Gachibowli and the Biodiversity Level-1 flyover face another diversion. Instead of proceeding to Khajaguda Junction for the right turn towards Nanakramguda, vehicles will have to take the Pakwan U-turn and proceed through Khajaguda Lake Road. The separate diversion map issued for this approach directs motorists from the Biodiversity side towards the Khajaguda-Lanco Hills stretch.

For regular users of the junction, particularly IT employees travelling towards the western Hyderabad office corridor, the diversions could mean factoring additional time for the commute, especially during peak hours.

Cyberabad Traffic Police asked motorists to avoid the affected approaches wherever possible and use the alternative routes for the duration of the works.



Source link

]]>
Hyderabad’s Paradise-Shamirpet elevated corridor hopes to take long-distance traffic off local roads https://artifex.news/article71488339-ecerand29/ Tue, 22 Sep 2026 08:24:00 +0000 https://artifex.news/article71488339-ecerand29/ Read More “Hyderabad’s Paradise-Shamirpet elevated corridor hopes to take long-distance traffic off local roads” »

]]>

For 28-year-old Y. Bharat, the commute home from Begumpet to Kowkur means negotiating one congested junction after another. The snarls stretch through Paradise, Karkhana, Trimulghery, Alwal and Hakimpet, and it is only after turning towards Kowkur that the drive becomes easier.

It is this long, stop-and-go journey that the proposed elevated corridor from Paradise Junction to the Outer Ring Road (ORR) at Shamirpet is expected to change, offering through traffic a route above some of the busiest stretches of northern Hyderabad and Secunderabad.

18.1-km corridor with multiple entry and exit ramps

The 18.1-km corridor along Rajiv Rahadari (SH-1) is planned with multiple entry and exit ramps, allowing motorists travelling between the city and areas including Alwal, Bolarum, Kowkur, Thumkunta and Shamirpet to bypass several junctions along the existing surface road.

Commuters waiting at the Trimulghery cross road signal on Monday evening in Hyderabad.
| Photo Credit:
SIDDHANT THAKUR

Journey from farter north towards central Hyderabad

For those living farther north, the difference could be substantial. At present, commuters from Shamirpet and Thumkunta heading towards central Hyderabad have to pass through Hakimpet, Bolarum, Alwal, Trimulghery, Karkhana and Patny before reaching Paradise. Once completed, the elevated corridor is expected to separate a sizeable portion of this through traffic from vehicles making shorter local journeys.

Regular commuters who observed traffic situation deteriorate

“The snarls continue almost all the way till Hakimpet. It [commute] used to take me 35-40 minutes about four years ago. Now it takes more than an hour! Only after taking the right towards Kowkur does the traffic ease,” said Mr. Bharat, who works in Begumpet. He hopes the corridor will substantially cut the time he spends navigating the stretch every day.

Tito George (32), a resident of Janapriya Homes in Bolarum, has watched the situation deteriorate over the past five years. “Traffic has gone from bad to worse in the last five years alone. We are hoping the elevated corridor will finally bring some relief,” he said.

For residents of neighbourhoods along the alignment, the expected benefit is not necessarily about travelling all the way to Shamirpet. Anibrith Bhattacharjee of Lothkunta, Alwal, hopes shifting long-distance traffic onto the elevated road will free up the surface-level carriageway for people making shorter trips within the neighbourhoods.

The project, however, comes with considerable disruption before that relief arrives.

Demolitions

Road widening and preparatory works have already altered stretches of Lothkunta and Shamirpet, where shops, hospitals and other establishments have been demolished. The project will also require the demolition of the Trimulgherry RTO office and the Marredpally Traffic Police Station among other establishments.

For T. Sruthi who is a resident of Karkhana — one of the busiest points along the route — the immediate question is how commuters will negotiate the construction phase. Traffic already funnels through a relatively constrained stretch here, and construction activity and diversions could make everyday travel harder before the corridor becomes operational.

Similar concerns have surfaced among Hyderabad residents discussing the project on social media. While some have described the existing route as a traffic nightmare and welcomed infrastructure that could provide a faster connection to the ORR, others have questioned whether adding more road capacity alone will provide lasting congestion relief, arguing for stronger public transport alongside road infrastructure.

Once operational, however, the most visible change for motorists could be the ability to travel considerable distances without descending into every major junction below. An official from Hyderabad Metropolitan Development Authority (HMDA) said the project is estimated to be completed by the beginning of 2028. Local motorists, meanwhile, could benefit from fewer long-distance vehicles competing for space on the surface road.

Commuters waiting at the Trimulghery cross road signal in Secunderabad on Monday (September 21, 2026)
| Video Credit:
SIDDHANT THAKUR

Published – September 21, 2026 01:43 pm IST



Source link

]]>
Waiting at the gates: Gautamnagar’s long struggle for a rail underpass https://artifex.news/article71346631-ecerand29/ Sat, 15 Aug 2026 11:58:00 +0000 https://artifex.news/article71346631-ecerand29/ Read More “Waiting at the gates: Gautamnagar’s long struggle for a rail underpass” »

]]>

Motorists cross the road at Gautamnagar railway crossing in Malkajgiri, Hyderabad, on Friday.
| Photo Credit: RAMAKRISHNA G

Malkajgiri is a bustling suburb of the twin cities, known for the numerous railway lines criss-crossing its residential colonies. This has necessitated the construction of several Road Under Bridges (RUBs) and Road Over Bridges (ROBs) to facilitate seamless traffic movement.

However, some crossings still remain unbridged, including the one at Gautamnagar. The situation has worsened due to growing rail traffic on this route. MMTS suburban services, long-distance passenger trains, and lengthy freight trains frequently utilize this path to bypass the congested Secunderabad Railway Station, often moving at slow speeds through city limits.”

This is causing significant inconvenience to local residents and commuters as frequent gate closures lead to massive traffic snarls on either side of the level crossing (LC). “This level crossing frequently remains closed for 15 to 45 minutes, and sometimes for up to an hour during peak hours, due to consecutive train movements. Either they should expedite the proposed RUB or close this forever,” says Sudhakar Kanakamedala, a local. 

Though there are RUBs at Safilguda, Anandbagh and Lalaguda, they are few kilometres away forcing commuters to take a circuitous route, hence the rush to cross this particular LC. This is resulting in vehicles spilling into narrow residential lanes, causing severe delays for students, office-goers and even emergency services such as ambulances, residents point out.

The LC lies between Malkajgiri and Dayanandnagar stations and with more trains being provided at the latter, the closures have only risen in the last few years. “The gates remain shut till the train takes the curve near Dayanandnagar station,” claims Hari, another local person.

There is a case for building at least a Limited Height Subway (LHS), attests Zonal Railway Users’ Consultative Committee (ZRUCC) member Noor Ahmed Ali. “I had proposed the work many years ago and it has remained pending for various reasons including land acquisition which has faced opposition. The local public representatives too are seized of the issue and we are hopeful the work will be expedited.”

South Central Railway (SCR) officials say that Malkajgiri itself is uniquely positioned between three main railway lines from Secunderabad station – one towards Nizamabad, other towards Kazipet and there is another Ammuguda line.

“This criss-cross of railway lines amid densely populated colonies has been leading to traffic issues. But, wherever feasible we have been trying to build RUB/ROBs with the assistance of the local municipal authorities over the years,” says senior officials.

Yet, clearly, the lack of coordination between the municipal and railway authorities is apparent, considering the delay in sanctioned projects too. An RTI reply obtained by citizen activist Robin Zaccheus disclosed that only 51% of the 211 ROB/RUB projects across Telangana have been completed to close the associated level crossings. Remaining projects have been delayed due to issues related to land acquisition, funding, design finalisation and inter-departmental coordination.

These works include 82 ROBs and 129 RUBs at locations such as Safilguda, Ghatkesar-Bibinagar, Ammuguda-Moula Ali and Neredmet-Moula Ali, among others. Around 38 works are under construction, tenders have been finalised for 18 projects, 32 are facing land acquisition hurdles and 15 are delayed for other reasons.

“Allowing level crossings to continue operating in densely populated areas poses a risk to commuters, including schoolchildren. A lot of fuel is also wasted as motorists wait for the gates to reopen. Funding has also emerged as a major hurdle after the Telangana government withdrew its cost-sharing consent in May 2024, leaving the Railways to bear the entire cost of such projects. This has resulted in revised timelines and further delays,” he says.

Even within the railways, there is no single authority overseeing these projects, Mr. Zaccheus points out, and calls for an empowered joint task force to monitor such works, ensure time-bound execution and adopt standardised designs.

However, there is good news for Gautamnagar residents. Work on the proposed RUB work is likely to begin soon. “We have received design approval from the municipal authorities. Tendering process is currently on for taking up the ₹34 crore worth works, including ₹10 crore to the municipal authorities for shift of utilities. Efforts are on to complete other pending works soon,” said SCR Chief Public Relations Officer A. Sridhar.



Source link

]]>
Heavy rain lashes parts of Hyderabad, waterlogging in many areas https://artifex.news/article71336130-ecerand29/ Wed, 12 Aug 2026 13:55:00 +0000 https://artifex.news/article71336130-ecerand29/ Read More “Heavy rain lashes parts of Hyderabad, waterlogging in many areas” »

]]>

Rain catching commuters off guard near Dharna Chowk in Hyderabad on Wednesday.
| Photo Credit: SIDDHANT THAKUR

After days of bright and dry weather, Hyderabad witnessed heavy rainfall in several parts of the city on Wednesday, with a sudden change in weather catching commuters off guard.

The skies turned dark shortly after 3 p.m., followed by intense rainfall in several areas. Waterlogging and slow traffic movement were reported at multiple locations, including near Taj Krishna towards KCP Junction and the Panjagutta flyover.

Commuters were caught by surprise by the sudden downpour, with several people seen taking shelter beneath Metro stations and other covered spaces to escape the rain. Heavy rainfall was reported from Ameerpet, Khairatabad, Madhura Nagar, Nagole, Jubilee Hills, Banjara Hills and Madhapur, among other areas.

According to Telangana Development Planning Society data, the city had recorded no rainfall in several locations until 3 p.m. However, rainfall intensified rapidly over the next hour. As of 4 p.m., Khairatabad had recorded 13.8 mm followed by 12.3 mm in Srinagar Colony, 11.5 mm in Banjara Hills, 9.8 mm in Borabanda, 9.5 mm in Ameerpet, 9.5 mm in Jubilee Hills and 7.5 mm in Madhapur.



Source link

]]>
Hyderabad’s new elevated corridor reshapes a neighbourhood, one shop at a time https://artifex.news/article71318064-ecerand29/ Fri, 07 Aug 2026 19:35:00 +0000 https://artifex.news/article71318064-ecerand29/ Read More “Hyderabad’s new elevated corridor reshapes a neighbourhood, one shop at a time” »

]]>

For decades, the nearly 500-metre stretch along Rajiv Rahadari in Lothkunta was more than just a busy roadside corridor; it was part of the neighbourhood’s daily rhythm. Residents bought medicines from local pharmacies, stopped by restaurants and general stores, while IT employees returning from nearby offices gathered at tea stalls. In the early 2000s, a small VCD and DVD shop was a popular hangout, long before OTT platforms changed the way people watched films.

Today, those familiar storefronts have been reduced to rubble as the shops are being demolished to make way for the proposed Paradise-Shamirpet elevated corridor.

Earthmovers clear a nearly 500-metre stretch along Rajiv Rahadari in Lothkunta during an ongoing road-widening project. Once a familiar neighbourhood landmark for residents and commuters, the stretch has been reduced to rubble to make way for a wider road aimed at easing traffic congestion. Video by
| Video Credit:
RAMAKRISHNA G.

The transformation marks the beginning of one of Hyderabad’s largest transport infrastructure projects. Planned along Rajiv Rahadari (State Highway-1), the 18.1-km corridor will run from Paradise Junction to the Outer Ring Road near Shamirpet via Trimulgherry, Karkhana, Lothkunta, Alwal, Bolarum and Thumkunta.

Around 11.6 km of the corridor will comprise an elevated six-lane flyover while the remaining stretch will include service roads and a short underground tunnel near Hakimpet Air Force Station.

The project aims to ease congestion on one of Secunderabad’s busiest traffic corridors, particularly around the Lothkunta railway bridge, where vehicles often crawl through bottlenecks.

In Lothkunta, restaurants, medical shops, bakeries, general stores, sweet shops, tea stalls, automobile workshops and furniture stores have either been demolished or are awaiting demolition. Many had served the neighbourhood for over two decades.

Sanjana A.G., a private employee from Adarsh Nagar, remembers spending evenings at a 6×4 foot DVD shop on the main road. “It was where we bought and rented Bollywood films on Moser Baer discs and Hollywood movies. As OTT streaming took over, the owner switched to selling mobile phone spare parts. Looking back, most of the English I speak today came from the films I watched from that little shop. It was much more than just a store,” she says.

Traffic officials say construction has been planned to minimise disruption. “Construction of the flyover and the proposed Metro alignment will begin only after the service roads are completed. This is a State highway with very high traffic volume and there is simply no scope to divert vehicles elsewhere. The service roads are compulsory and will ensure traffic continues to move even while construction is under way,” says Trimulgherry Traffic ACP G. Shankar Raju.

No major traffic changes are expected during the initial phase, except temporary congestion caused by waterlogging during heavy rain, he adds. Once completed, the elevated corridor is expected to significantly ease travel for commuters between Patny, Karkhana, Alwal, Lothkunta, Thumkunta and Shamirpet. “Traffic heading towards Shamirpet will move on the elevated corridor instead of passing through internal roads. The existing bottlenecks on the narrow State highway will disappear, making travel much smoother for local commuters as well,” he explains.

Among the landmarks lost is Sri Laxmi Reddy Sweets, a popular evening stop for chaat and pani puri. “We have had this shop since 2003. Now our regular customers make the trip to our other branches in Neredmet and Old Alwal,” says M.N. Reddy, the shop owner.

The project extends beyond private businesses. The Secunderabad North Zonal Regional Transport Authority office, the Trimulgherry Traffic Police office and the Karkhana Traffic Police Station will be demolished and relocated. Several defence establishments in Secunderabad Cantonment are also affected.

Newer establishments have not been spared either. A three-year-old hospital at the Lothkunta Y-junction has been demolished while a watch repair shop near Lakshmi Kala Mandir theatre in Venkatapuram has disappeared. “I bought my first watch from there after my Class X exams in 2007. It wasn’t an expensive brand, but it felt special at the time,” said Avula Harish, a resident of West Venkatapuram.

For traders, the loss extends beyond buildings. “It is not just about reopening elsewhere,” said Kamlesh Kumar, whose wholesale edible oil business is awaiting demolition. “Fortunately, we found another place just inside the lane. We have started telling our regular customers where to find us.”

Land acquisition began in 2024, with compensation awards passed in March this year. Officials estimate the project will take three to four years to be completed.

While the corridor is expected to dramatically improve traffic flow, police officials caution that the free-flowing carriageway could also encourage higher speeds, making speed-related crashes a concern once it becomes operational.

Published – August 08, 2026 01:05 am IST



Source link

]]>
Hyderabad SI suspended after letting six-year-old granddaughter drive, claims he was preparing her for Guinness World Record https://artifex.news/article71214316-ecerand29/ Sun, 12 Jul 2026 20:49:00 +0000 https://artifex.news/article71214316-ecerand29/ Read More “Hyderabad SI suspended after letting six-year-old granddaughter drive, claims he was preparing her for Guinness World Record” »

]]>

SI Pujari Tirupathi along with his granddaughter
| Photo Credit: By Arrangement

A Hyderabad Police Sub-Inspector was booked after allowing his six-year-old granddaughter to drive a car on the busy Gandhamguda–Bairagiguda road in Narsingi, with the officer claiming he was preparing her for a Guinness World Records attempt as the world’s youngest driver.

Following the incident, the Telangana Director General of Police C.V. Anand directed the Cyberabad Police Commissioner M. Ramesh to suspend the accused SI and initiate a departmental inquiry into the matter.

The accused, Pujari Tirupathi, is an SI-rank officer attached to the Hyderabad City Police and is currently in the Vacancy Reserve. The incident, which was reported around 5 p.m. on Saturday, came to light after a video showing the child behind the wheel while the officer occupied the front passenger seat went viral on social media platforms.

The footage showed a line of vehicles honking behind the car as traffic slowed on the busy stretch. According to the police, the incident caused a brief traffic hold-up and triggered widespread criticism from motorists and social media users, many of whom demanded action against the officer.

Traffic piles up on the busy Gandhamguda–Bairagiguda road in Narsingi.

Traffic piles up on the busy Gandhamguda–Bairagiguda road in Narsingi.
| Photo Credit:
By Arrangement

When commuters stopped the vehicle and confronted the officer, he defended his actions, stating that the car was an automatic vehicle and that he remained in control of the vehicle. Speaking to The Hindu, Narsingi Police Inspector G. Hari Krishna Reddy said the officer claimed he was training his granddaughter in preparation for a Guinness World Records attempt to make her the youngest driver.

The car in question, bearing registration number ‘TS 07 GP 7450’ and registered in Tirupathi’s name, already had six pending traffic violations with unpaid challans amounting to ₹3,800. Four challans were issued in Mahbubnagar and two in Hyderabad.

A case has been registered against the officer under Section 125 (endangering life of others) of the Bharatiya Nyaya Sanhita and Sections 184 (dangerous driving) and 180 (allowing unauthorised persons to drive vehicles)of the Motor Vehicles Act, 1988. Police said a notice would be served to the accused. Under the law, the vehicle’s registration is suspended for 12 months, while the juvenile will be ineligible to obtain a driving licence until attaining the age of 25 years. The registered owner who permits a minor to drive may also face a fine and imprisonment of up to one year.



Source link

]]>
Traffic bottleneck outside Sarath City mall leaves motorists stranded for hours on Gachibowli–Miyapur corridor; underpass, skywalk pitched https://artifex.news/article71193044-ecerand29/ Wed, 08 Jul 2026 02:38:00 +0000 https://artifex.news/article71193044-ecerand29/ Read More “Traffic bottleneck outside Sarath City mall leaves motorists stranded for hours on Gachibowli–Miyapur corridor; underpass, skywalk pitched” »

]]>

A traffic bottleneck outside Sarath City Capital Mall in Kondapur has become one of Hyderabad’s worst congestion hotspots, with motorists spending up to two hours negotiating a few hundred metres during peak hours. The situation has escalated to the point where Cyberabad authorities have warned the mall management to address the issue or face action, including the possibility of a closure notice.

The choke point sits on the Gachibowli–Miyapur road, one of Hyderabad’s busiest arterial corridors that carries around 1.2 lakh vehicles every day. Despite the construction of a 22-ft-wide underpass last year connecting the mall’s parking area to the main road, congestion continues to spill over from the mall entrance to Botanical Garden junction and up to the Radisson Hotel, disrupting movement along the entire corridor.

Traffic on six lanes squeeze into two lanes

“Three lanes of traffic coming from the Botanical Garden side combine with another three lanes exiting the mall parking. This six-lane traffic is forced into just two lanes between the mall and the Kothaguda junction, where the available carriageway suddenly narrows. That is the primary reason for the long traffic queues,” explained Gachibowli Traffic Inspector Gona Suresh.

Gachibowli Traffic Police managing traffic in front of Sarath City Capital Mall in Kondapur.
| Photo Credit:
By Arrangement

The problem is compounded by the absence of a dedicated pick-up and drop-off facility for cabs and autorickshaws. Thousands of shoppers wait for rides directly outside the mall entrance while cabs and autos queue on the carriageway, occupying valuable road space.

“Although the road in front of the mall has four lanes, more than two lanes are occupied by waiting autos and cabs. Visitors gathering near the entrance slow vehicle movement further, making entry into the mall difficult and blocking another lane of traffic,” the officer said.

1.5 lakh – 2.5 lakh footfall on weekends

According to Cyberabad Taffic Police estimates, the mall attracts between 50,000 and 60,000 visitors on an average day, besides employing around 3,500 to 4,500 people. Weekend footfall rises to between 1.5 lakh and 2.5 lakh visitors, with nearly 1.5 lakh to 1.8 lakh people arriving during the peak evening hours between 4 p.m. and 8 p.m. During festive periods, daily footfall exceeds three lakh, while more than six lakh visitors turned up during last Christmas alone.

For commuters, these numbers translate into long delays. Several visitors reported spending between 45 minutes and one-and-a-half hours just to exit the parking facility, while crossing the stretch outside the mall can take nearly two hours during peak periods.

“It took me 40 minutes just to get out of the mall parking and onto the road, and another 25 minutes to clear the stretch. A whole hour wasted on one lane,” a commuter wrote on Reddit. Another said, “It took me 45 minutes to come out of the mall parking. I vowed never to visit the mall again or even travel on that road.”

Traffic police regularly clear illegally parked vehicles and issue challans for obstructing the carriageway. However, officials say the exercise is proving counterproductive.

“When we move the vehicles away, many drivers simply take a U-turn at Botanical junction and return to the same spot. That creates another bottleneck at the junction itself, where traffic from Cyber Towers and Miyapur is already converging, with congestion often stretching up to the Radisson Hotel,” an official said.

Recognising the worsening situation, Cyberabad traffic police and municipal authorities have conducted multiple joint inspections over the past week to identify long-term solutions.

Cyberabad Joint Commissioner of Police (Traffic) Sunpreet Singh along with officials from Gachibowli traffic wing inspecting the premise on July 6, 2026.

Cyberabad Joint Commissioner of Police (Traffic) Sunpreet Singh along with officials from Gachibowli traffic wing inspecting the premise on July 6, 2026.
| Photo Credit:
By Arrangement

Officials said the underpass constructed last year eased congestion inside the parking area but failed to resolve traffic outside the mall. Traffic police have now proposed an underpass or inlet ramp from the Botanical Garden side leading directly to the B1 parking level as a dedicated pick-up and drop-off point for cabs and autorickshaws, allowing vehicles to exit through the existing ramp without stopping on main carriageway.

The parking to road ramp at Sarath City Mall in Kondapur.

The parking to road ramp at Sarath City Mall in Kondapur.
| Photo Credit:
By Arrangement

The proposal follows the rejection of the mall management’s request for a direct entry from the main carriageway into the parking, with municipal authorities saying it would consume more than one-third of the available carriageway.

Traffic police have also proposed constructing a skywalk linking the mall to the opposite side of the road so that passengers can meet cabs and autorickshaws away from the entrance. Officials estimate the move could shift 40% of waiting commuters away from the frontage and significantly ease congestion.

Alongside these measures, authorities are identifying commercial buildings, religious structures and other encroachments along the Gachibowli–Miyapur corridor that have narrowed the carriageway at several locations. Officials say notices are expected to be issued for their removal to widen the carriageway and improve traffic flow.

Published – July 07, 2026 04:13 pm IST



Source link

]]>
Day 1 of IIIT junction diversions forces over 10,000 IT employees onto longer routes, triggers congestion https://artifex.news/article71170601-ecerand29/ Wed, 01 Jul 2026 20:44:00 +0000 https://artifex.news/article71170601-ecerand29/ Read More “Day 1 of IIIT junction diversions forces over 10,000 IT employees onto longer routes, triggers congestion” »

]]>

Traffic builds up near the Radisson Hotel as commuters are routed via Gachibowli-Miyapur road amid traffic restrictions for ongoing multi-level flyover and underpass at IIIT junction.
| Photo Credit: SIDDHANT THAKUR

The first day of traffic restrictions at IIIT junction for construction of a multi-level flyover and underpass saw over 10,000 IT employees adjusting to revised routes as traffic was rerouted onto the Gachibowli-Miyapur road and the Radisson Hotel junction. While police described the diversions as largely manageable, commuters reported longer travel times, congestion and confusion on one of the key gateways to Hyderabad’s IT corridor.

The restrictions on DLF Road Number 1 have effectively closed one of the two access routes used by employees working in the DLF and TCS campuses, forcing all traffic onto the Radisson Hotel stretch.

“Around 25% of commuters approach via DLF Road Number 1 while the rest enter through the Radisson Hotel road. With the restrictions, all employees have been asked to use the latter, increasing traffic load on that stretch,” explained Gachibowli Traffic Inspector Gona Suresh.

The two IT companies together see 10,000-12,000 employees daily under the present hybrid work pattern. Under the revised traffic plan, vehicles travelling from Lingampally towards DLF Road are being diverted via Gachibowli junction and the Radisson Hotel junction before reaching DLF Road. The diversion has added 1.5 km to the journey and increased travel time by at least 10 minutes.

Traffic diversions implemented by the Cyberabad traffic police from July 1.

Traffic diversions implemented by the Cyberabad traffic police from July 1.
| Photo Credit:
By Arrangement

The restrictions come at a junction that already carries enormous traffic volumes. Official estimates indicate that 2.6 lakh to 2.8 lakh vehicles travel daily between Lingampally and Gachibowli while DLF Road itself carries around 2 lakh vehicles every day. The Radisson Hotel junction is already a major bottleneck, with three lanes of traffic from the P. Janardhan Reddy (PJR) flyover and two from Gachibowli junction converging onto a carriageway barely wide enough for three lanes.

Traffic builds up near the Radisson Hotel in Hyderabad.

Traffic builds up near the Radisson Hotel in Hyderabad.
| Photo Credit:
SIDDHANT THAKUR

Commuters travelling from the Radisson Hotel are being diverted via Gachibowli junction before proceeding through Indiranagar to reach IIIT, adding around 4 km in distance and around 20 minutes in travel time.

Meanwhile, excavation for the underpass has occupied 18 to 21 metres of the median along the Old Mumbai Highway, leaving only 2 to 2.5 lanes, varying across different stretches, available for traffic.

Minor traffic hold-ups were reported near the TCS campus on Wednesday morning, where police are allowing only authorised vehicles into the campus access road after verifying employee identity cards.

Work on multi-level flyovers offers hope and dread in equal measure to motorists on the busy IIIT road and Gachibowli junction.

Work on multi-level flyovers offers hope and dread in equal measure to motorists on the busy IIIT road and Gachibowli junction.
| Photo Credit:
RAMAKRISHNA G.

“We have provided one-lane access for around 200 metres to TCS employees. A few vehicles queued up during ID verification, while some motorists mistakenly entered, assuming it is a through road. They were then asked to take a U-turn, creating brief hold-ups,” Suresh said. TCS has now been asked to install boards stating “Entry only for TCS employees”, while the staffs has also been advised to use the alternate campus gate from the IIIT-Lingampally road.

Bharath Krishnan, a scholar at the University of Hyderabad who regularly uses the DLF Road, said the junction had long been a bottleneck even before the latest restrictions. “With the reduced road width and ongoing construction, the journey has become more dangerous. Many commuters earlier used DLF Road to bypass Gachibowli junction. Routing all of them through the junction has increased congestion and wait time further,” he said.

Traffic police maintained that motorists would require a few days to become familiar with the revised traffic pattern. Officials said internal roads within DLF have also begun witnessing increased traffic from commuters attempting to bypass the main diversion.



Source link

]]>
India’s traffic chokehold: Bengaluru ranks second; Pune fifth in global congestion index for 2025 https://artifex.news/article70532049-ecerand29/ Wed, 21 Jan 2026 05:40:00 +0000 https://artifex.news/article70532049-ecerand29/ Read More “India’s traffic chokehold: Bengaluru ranks second; Pune fifth in global congestion index for 2025” »

]]>

Traffic jam on Kasturba Road near Cubbon Park in Bengaluru is a routine for many motorists.
| Photo Credit: The Hindu

Motorists in Indian cities continue to be caught up in traffic gridlocks for hours at end losing up to a week per year according to 2025 mobility data. Bengaluru was the second most congested city in the world in 2025, with an average speed of 16.6 km per hour, an average motorist spending 15 minutes to commute 4.2 km, according to the 2025 congestion data released by Netherlands-based location technology firm TomTom. Mexico recorded the highest congestion levels globally, according to the location technology firm.

Pune was ranked fifth and was the second Indian city to feature in the global top 10 in terms of congestion. Mumbai showed signs of improvement, registering a 3.3 percentage-point drop in congestion compared to 2024. Despite this decline, commuters in the financial capital still lost 126 hours a year, with average speeds hovering at 20.8 kmph. New Delhi, recorded a congestion level of 60.2% and an increase of 3.5 percentage points, with motorists losing 104 hours annually.

Of the top 10 cities with the highest congestion in Asia, six were from India: Bengaluru (1), Pune (2), Mumbai (6), New Delhi (7), Kolkata (9), and Jaipur (10). Chennai ranked 11th, while Hyderabad was placed 15th in the Asia ranking.

The TomTom Traffic Index is compiled using anonymised GPS data and real driving speeds from across the world. “The Index benchmarks cities on their congestion levels, travel times, and speeds, based on worldwide trip data spanning more than 3.65 trillion km, providing access to traffic information city by city,” the firm said.

In 2024, an average motorist in Bengaluru spent 34 minutes and 10 seconds to cover 10 km. In 2025, the same distance took 36 minutes and 9 seconds—an increase of 2 minutes and 4 seconds. On average, a motorist in Bengaluru spent 168 hours in traffic during the year, or the equivalent of seven days and 40 minutes.

Other Indian cities on the list included Mumbai at 18th place (126 hours a year), Delhi at 23rd (104 hours), and Kolkata, which was ranked second globally for congestion in 2024 but slipped to 29th in 2025, with motorists spending 150 hours annually in traffic. Chennai was ranked 32nd, while Hyderabad stood at 47th.

Hyderabad ranked 15th and stood out as one of the few Indian cities to record an improvement, with congestion falling by 1.3 percentage points compared to the previous year. While Bengaluru saw a 1.7 percentage-point increase in average congestion levels in 2025. Chennai saw a 1% increase in average congestion.



Source link

]]>