Skip to content
  • Facebook
  • X
  • Linkedin
  • WhatsApp
  • Associate Journalism
  • About Us
  • Privacy Policy
  • 033-46046046
  • editor@artifex.news
Artifex.News

Artifex.News

Stay Connected. Stay Informed.

  • Breaking News
  • World
  • Nation
  • Sports
  • Business
  • Science
  • Entertainment
  • Lifestyle
  • Toggle search form
  • Carlos Alcaraz Leads Tennis Into New Golden Age Sports
  • ISRO “Very Busy” With Series Of Space Exploration Missions: S Somnath Nation
  • “Like Mahabharat…”: Pakistan Great On Hype In World Cup Game vs India, Explains Why His Team Will Be ‘Lonely’ Sports
  • “Pistol Shooters Behind Schedule, Don’t Know Who Will Go To Olympics”: Jaspal Rana Sports
  • How the deadliest virus in human history paved the way for new cures Science
  • “No One In Team Talks About Jasprit Bumrah’s…”: India Star Reveals Inside Secrets Amid T20 World Cup Sports
  • Cricket World Cup: On Reports Saying India Will Wear Alternate Jersey vs Pakistan, BCCI Says This Sports
  • Omar Ayub Of Imran Khan’s Party Named Leader Of Opposition In Pakistan National Assembly World

How will South India’s first double-decker flyover in Bengaluru ease traffic?

Posted on July 22, 2024 By admin


The story so far 

On July 5, 2023, Bengaluru saw the commencement of a trial run for South India’s first double-decker flyover. This project, undertaken by Bangalore Metro Rail Corporation Limited (BMRCL), faced several delays but is now partially open to ease the notorious traffic congestion at Central Silk Board junction.

Deputy Chief Minister D.K. Shivakumar inaugurated the trial run, driving from Ragigudda to Central Silk Board, accompanied by Transport Minister Ramalinga Reddy.

What is the cost and length of the flyover?

The flyover, stretching 5.12 km, was built at a cost of ₹449 crore. It aims to alleviate the bottleneck at Central Silk Board junction by providing a signal-free corridor from Ragigudda to HSR Layout and Hosur Road. This construction is expected to reduce travel time by over 30%.

“The new flyover features loops and ramps designed to facilitate signal-free travel from Ragigudda to HSR Layout and Hosur Road. It aims to provide a smoother and faster route for people heading towards K.R. Puram and Hosur Road, potentially reducing travel time by more than 30%,” a BMRCL official said.

The double-decker flyover features two separate carriageways, each with two lanes. It passes by three metro stations: Jayadeva Hospital, BTM Layout, and Silk Board Junction. 
| Photo Credit:
MURALI KUMAR K

What are its structural features?

The flyover features loops and ramps to facilitate smooth travel. However, some ramps connecting HSR Layout to Ragigudda and BTM Layout remain under construction. These sections, measuring 1.37 km, are expected to be completed by June 2025.

The double-decker flyover features two separate carriageways, each with two lanes. It passes by three metro stations: Jayadeva Hospital, BTM Layout, and Silk Board Junction. The structure will ultimately include five ramps. Currently, Ramps A, B, and C are complete, while construction on Ramps D and E is ongoing, with an expected completion date of May, 2025.

Ramp A provides a connection between the Ragigudda metro station and Hosur Road. Ramp B branches off from Ramp A, heading towards HSR Layout. Ramp C connects BTM Layout to Hosur Road and HSR Layout via Ramp A. Ramp D will be elevated above Ramp A and the metro line, facilitating a route from HSR Layout to Ragigudda. Finally, Ramp E will descend from the HSR Layout to BTM Layout.

What does the traffic police say?

During peak hours, traffic from Ragigudda to Silk Board often experiences heavy congestion, which occasionally persists even during non-peak times. This route crucially connects Basavanagudi, Jayanagar, BTM Layout to Hosur Road, Electronic City, and HSR Layout, serving thousands of vehicles daily.

According to Bengaluru traffic police, the new flyover is expected to alleviate rush hour congestion significantly along the Ragigudda and BTM Layout stretch to Hosur Road and HSR Layout. A police official mentioned that the flyover could potentially reduce travel times from 30-45 minutes down to just ten minutes.

Vehicles plying on the newly built double deck metro cum road flyover.

Vehicles plying on the newly built double deck metro cum road flyover.
| Photo Credit:
MURALI KUMAR K

Why was the flyover opened as a trial run?

Despite the project being almost completed months back, inauguration was delayed. The trial run was initiated in response to growing public demand for the flyover’s opening. There were also protests by the Aam Aadmi Party (AAP).

Mr. Shivakumar also highlighted the necessity of utilising the completed sections to avoid wastage of resources and to provide immediate relief to the city’s traffic woes. He said though there are still a few stretches that need to be completed, it can be used by the public. “I have requested the Central Minister as well. I don’t want this project to go to waste. Therefore I wanted to conduct a trial run. There are still a few small patches that need to be completed. After that, we will have a formal inauguration. However, we are allowing the public to use it in the meantime,” he has said.

The formal inauguration has been postponed due to the need for a joint representation from the Union Ministry of Housing and Urban Affairs and the Karnataka government. Despite this, the flyover has been made accessible to the public on a trial basis, with a formal event planned once coordination with both governments is finalized.

“Given the public demand to open the flyover, it has been made accessible as a trial run. However, a formal inauguration will take place later in the presence of representatives from both the Union and State governments,” sources in BMRCL also said.

Double decker flyover and Yellow Line metro

The double-decker flyover is part of the 18.82-km-long Yellow Line metro under construction, which connects R.V. Road to Bommasandra. This fully elevated metro route features 16 stations and connects with the Green Line of Bengaluru Metro at R.V. Road Station and the Pink Line at Jayadeva Hospital Station.

The 16 stations along this elevated route are Rashtriya Vidyalaya Road, Raggigudda, Jayadeva Hospital, BTM Layout, Central Silk Board, Bommanahalli, Hongasandra, Kudlu Gate, Singasandra, Hosa Road, Beratena Agrahara, Electronics City, Infosys Foundation Konnappana Agrahara, Huskur Road, Biocon—Hebbagodi, and Bommasandra.

Officials stated, “The Jayadeva Metro Station stands as an iconic interchange hub designed to seamlessly integrate the Yellow Line (R.V. Road to Bommasandra) Reach 5 and the Pink Line Reach 6 (Kalena Agrahara to Nagawara).”

This integration includes the Bannerghatta Road underpass, Mareanahalli Road at ground level, Raggigudda – CSB Road flyover, Metro Concourse level, Reach 5 platform for the Yellow Line (R.V. Road to Bommasandra), and Reach 6 platform for the Pink Line (Kalena Agrahara-Nagawara). “This station serves as a pivotal point connecting different metro lines and facilitating efficient transit between them,” officials added.

How will connectivity get better?

The Yellow Line aims to enhance connectivity to key areas housing major companies like Infosys and Biocon, as well as to South Bengaluru.

“This line is set to significantly alleviate the daily challenges faced by Bengaluru’s metro commuters,” officials said. “It will augment the overall metro connectivity in the city, contributing to a more convenient and efficient commuting experience. The commissioning of this line is expected to profoundly impact the lives of Bengaluru’s metro commuters, offering them a more comfortable and efficient service. Additionally, Bengaluru Metros will become the second in the country to feature driverless trains.”

What are the proposed double-decker flyover corridors in Bengaluru?

In March this year, BMRCL initiated a tender process for a feasibility study to construct double-decker flyovers along three Namma Metro corridors in Bengaluru under phase 3A.

The proposed corridors include J.P. Nagar 4th Phase to Hebbal (29 km), Hosahalli to Kadabagere (11.45 km), Sarjapur to Ibbalur at ORR Junction (14 km), and Agara to Koramangala 3rd Block (2.4 km), which is part of the Sarjapur-Hebbal corridor (37 km), as stated in the notification.

Mr. Shivakumar has been for the construction of double-decker flyovers in the city. “These flyovers are intended to host vehicles on the lower deck while accommodating the metro on the upper deck, with the objective of easing traffic congestion in the city,” he had said earlier.



Source link

Nation Tags:double-decker flyover in Bengaluru, ease the notorious traffic congestion at Central Silk Board junction, heavy congestion of traffic from Ragigudda to Silk Board, Ragigudda to HSR Layout and Hosur Road, signal-free travel from Ragigudda to HSR Layout and Hosur Road

Post navigation

Previous Post: Economic Survey To Be Tabled In Parliament Today. What Is it
Next Post: China and the Philippines announce deal aimed at stopping clashes at fiercely disputed shoal

Related Posts

  • 4 Killed, 2 Injured In Multi-Truck Accident On Haryana Highway Nation
  • Delhi’s Third Waste-To-Art Park Named Shaheedi Park Nation
  • DMK MP A Ganeshamurthi Dies In Hospital After Suspected Suicide Attempt Nation
  • BJP Odisha Chief Says Party Will Go Solo, Then Walks Back Remark Nation
  • Sympathy For Stray Dogs Should Not Come At Cost Of Creating Chaos: Karnataka Court Nation
  • US Woman Found Chained To Tree In Maharashtra Jungle Had Visited Mumbai In June: Police Nation

More Related Articles

Bombay High Court Grants Interim Stay On Order Permitting Indrani Mukerjea To Travel Abroad Nation
Man Attempts To Smuggle 10 Anacondas At Bengaluru Airport, Arrested Nation
AAP Ministers Seek Urgent Solution Of Delhi Water Crisis In Letter To PM Narendra Modi Nation
US Supports Elon Musk’s Remarks On India’s Permanent UNSC Seat Nation
After Manipur Congress MP Bimol Akoijam Parliament Speech, BJP What About Core Issues Jab Nation
ISRO To Conduct Three More Test Flights For Gaganyaan Mission Nation
SiteLock

Archives

  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022

Categories

  • Business
  • Nation
  • Science
  • Sports
  • World

Recent Posts

  • Haniyeh killing: India maintains silence
  • 2 Dead, 1 Injured After Cloudburst Triggers Landslide In Uttarakhand
  • Donald Trump On Kamala Harris
  • Paris Olympics: Angelique Kerber’s Tennis Career Ends With Defeat; Novak Djokovic, Carlos Alcaraz Progress
  • What does Haniyeh’s death mean for Israel-Iran rivalry?

Recent Comments

  1. TpeEoPQa on UP Teacher Who Asked Students To Slap Muslim Classmate
  2. xULDsgPuBe on UP Teacher Who Asked Students To Slap Muslim Classmate
  3. KyJtkhneiLmcq on UP Teacher Who Asked Students To Slap Muslim Classmate
  4. mOyehudovB on UP Teacher Who Asked Students To Slap Muslim Classmate
  5. GFBvgSrWPcsp on UP Teacher Who Asked Students To Slap Muslim Classmate
  • Lando Norris Takes Pole For Spanish Grand Prix, Max Verstappen Second, Lewis Hamilton Third Sports
  • Manchester City Shocked By Wolves, Manchester United Beaten By Crystal Palace Sports
  • Mallikarjun Kharge, PM Narendra Modi: Poors Have More Children, Why Do You Only Talk About Muslims: M Kharge To PM Nation
  • Delhi Police Debunks Claim That Mob Attacked Cop Who Kicked Men Offering Namaz Nation
  • Gazans Celebrate Eid Under The Shadow Of War World
  • Scientists find proof pain-sensing cells are either male or female Science
  • MS Dhoni’s First Appointment Letter For Indian Railways – Old Picture Goes Viral Sports
  • India vs Pakistan, Cricket World Cup 2023: “More Pressure For Tickets Than Match” – Babar Azam’s Bouncer On Ind-Pak Clash Sports

Editor-in-Chief:
Mohammad Ariff,
MSW, MAJMC, BSW, DTL, CTS, CNM, CCR, CAL, RSL, ASOC.
editor@artifex.news

Associate Editors:
1. Zenellis R. Tuba,
zenelis@artifex.news
2. Haris Daniyel
daniyel@artifex.news

Photograher:
Rohan Das
rohan@artifex.news

Artifex.News offers Online Paid Internships to college students from India and Abroad. Interns will get a PRESS CARD and other online offers.
Send your CV (Subjectline: Paid Internship) to internship@artifex.news

Links:
Associate Journalism
About Us
Privacy Policy

News Links:
Breaking News
World
Nation
Sports
Business
Entertainment
Lifestyle

Registered Office:
72/A, Elliot Road, Kolkata - 700016
Tel: 033-22277777, 033-22172217
Email: office@artifex.news

Editorial Office / News Desk:
No. 13, Mezzanine Floor, Esplanade Metro Rail Station,
12 J. L. Nehru Road, Kolkata - 700069.
(Entry from Gate No. 5)
Tel: 033-46011099, 033-46046046
Email: editor@artifex.news

Copyright © 2023 Artifex.News Newsportal designed by Artifex Infotech.